Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

FCR 110 CERTIFICATION EVALUATION EXAMS SOLVED QUESTIONS STUDY GUIDE GUARANTEED TO PASS

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

FCR 110 CERTIFICATION EVALUATION EXAMS SOLVED QUESTIONS STUDY GUIDE GUARANTEED TO PASS

Vista previa del contenido

FCR 110 CERTIFICATION EVALUATION EXAMS
SOLVED QUESTIONS STUDY GUIDE
GUARANTEED TO PASS


◉ The AH-64E uses what type of radar system? Answer: Pulsed Wave
Radar system.


◉ During the periods between transmissions of a pulsed radar system,
what is the radar doing? Answer: Listening for the echo.


◉ What is the difference between a B-scope display and a C-scope
display? Answer: B-scope displays target information in Azimuth and
Range.
C-scope displays target information in Azimuth and Elevation


◉ What are the three major components that make up the Longbow
Fire Control Radar (FCR)? Answer: Mast Mounted Assembly
(MMA), Radar Electronic Unit (REU)
Radar Frequency Interferometer (RFI) Processor


◉ How is the MMA cooled? Answer: Filtered ambient air drawn in
from the surrounding environment.

, ◉ How are the other FCR components cooled? Answer: The other
two components that make up the FCR system are located in the
IEFABs and therefore are cooled by the ECS air.


◉ Which component is zeroized when the Master Zeroize switch is
selected? Answer: The Non-Volatile memory of the Servo Electronics
LRM within the REU.


◉ Can the crew initiate another Power-on Built-In Test (PBIT) if the
FCR has timed-out under extremely cold conditions? Answer: YES. If
13 minutes have passed, the MP will report FCR as not operational.
An additional FCR power-up may then be started.


◉ What four items should the crew ensure prior to initiating an FCR
power-up sequence? Answer: MMA must be unpinned, Verify the
DMS-UTIL-BORESIGHT-BPS, offset value is correct, Heading Tape
present (EGI Alignment), and EFAB L/R ECS supply Temperature is
≤ 63 degrees F.


◉ Should both crewmembers perform the FCR Operational Check?
Answer: If it is anticipated that both the pilot and CPG will operate
the FCR during the mission, then this task should be completed in
both crew stations.


◉ How many scan sizes are available to the crew in any of the
targeting modes? Answer: Four. Wide (W), Medium (M), Narrow (N),
Zoom (Z).

Información del documento

Subido en
1 de agosto de 2026
Número de páginas
14
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
317
Última venta
-


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes