CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Document preview thumbnail
Vista previa 4 fuera de 36 páginas

CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Vista previa del contenido

CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+




A CM's role and responsibilities are governed solely by the Owner/CM Agreement.

True False - (ANSWER)True



There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of
construction management practice. However, there are some key differences. Which of the following do
not apply to both CM forms?

A) Both forms provide advice to the owner on constructibility, budget and the schedule.

B) Both require that the liabilities and risks assumed by the parties be clearly understood, coordinated,
and stated in the respective contracts.

C) Both forms allow the CM to function in an advisory role for the entire engagement of the CM.

D) Services can vary based on the contractual relationships of the parties and the risks that are assumed.
- (ANSWER)C) Both forms allow the CM to function in an advisory role for the entire engagement of the
CM.



Construction management had its beginnings in the early to mid-1960's. Which of the following factors
contributed to the initial use of this delivery system?

A) The need to reduce the overall time and cost associated with project delivery.

B) The increasing cost of money and the unpredictability of project funding streams.

C) The changing role of the general contractor and the increasing numbers of specialty trade contractors.

D) All of the above. - (ANSWER)D) All of the above.



The General Services Administration was the first federal agency to use construction management. -
(ANSWER)True



The General Services Administration, the Department of Health, Education and Welfare (now HHS), and
the Veterans Administration ran into similar difficulties in the use of construction management. Which of
the following was/were common problems for all three agencies?

A) Funding restrictions

,CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+




B) Claims

C) Change conditions

D) All of the above - (ANSWER)D) All of the above



CMAA was formed and incorporated 1982 with its primary focus being the growth and development of
the construction management profession. - (ANSWER)True



The CMAA Construction Management Standards of Practice is intended as a guide to the range of
services that constitute professional construction management. They seek to meet the documented
need for definitions of what construction management services are, without unduly structuring the
methodologies by which those services are provided by the CM. - (ANSWER)True



The goals of the Construction Management Association of America (CMAA) include:

A) Setting standards and developing contract documents for construction management practice.

B) Expanding the understanding of the construction management concept and its use in the
marketplace.

C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of federal,
state, and local governments.

D) All of the above. - (ANSWER)D) All of the above



The fact that an individual is certified or licensed in any other profession does not, per se, establish
him/her as a qualified CM.

True False - (ANSWER)True



Certification as a CM means the construction management practitioner has "state of the art" knowledge
and capability to practice construction management.

True False - (ANSWER)False

,CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+




Recruiting and training are business matters and normally do not involve ethical concerns.

True False - (ANSWER)False



Construction management is a concept that is susceptible to overselling.

True False - (ANSWER)True



Failure to provide quality services is a business and not an ethical question.

True False - (ANSWER)False



Contracting for adequate fees is both a business and an ethical issue.

True False - (ANSWER)True



The ethics of the CM profession focus primarily on a CM's relationships in dealing with its clients.

True False - (ANSWER)True



The possible approaches for delivering a project are virtually unlimited. A key reason for such variations
is:

A) The different roles that can be assumed by project participants.

B) Different forms of contracts and methods of compensation that can be used.

C) The different levels of care, responsibility, and risks assumed by the parties involved.

D) All of the above. - (ANSWER)D) All of the above



The traditional delivery system is characterized by executing the major phases of a project in:

A) An overlapping concept

B) A linear sequence

, CMIT Exam (200 multiple choice) Exam with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+




C) A fast track method

D) All of the above - (ANSWER)B) A linear sequence



A key advantage of the traditional delivery approach is:

A) With the traditional delivery system, the cost of the construction phase is known before construction
starts.

B) Facility features are fully determined & specified.

C) When the construction contract is signed, the major risk belongs to the contractor.

D) All of the above - (ANSWER)B) Facility features are fully determined & specified.



Design-build and at-risk construction management delivery systems allow the option to fast-track or
phase a project.

True False - (ANSWER)True



Most definitions of construction management are similar. However, a contractual definition is not known
until:

A) The legal form of the CM contract is chosen.

B) The specific scope of services to be provided is identified.

C) The relationship of the CM to others and the risks and authority assumed by the parties are clearly
defined.

D) All of the above - (ANSWER)D) All of the above



21.

In a CM-at-Risk arrangement once construction begins and the CM converts from the professional
advisory role of a CM to the contractual role of a general contractor, the CM has no implied duties of
loyalty and care to the owner.

True False - (ANSWER)True

Información del documento

Subido en
29 de julio de 2026
Número de páginas
36
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EliteChamp
5.0
(501)
Vendido
3133
Seguidores
0
Artículos
554
Última venta
1 día hace


Reseñas de compradores verificados



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes