An architect is responding to an RFP for a ground-up research laboratory located on
a wetland site. The site includes new road access and must be designed to meet local
codes and ordinances.
Which of the following subconsultants should the architect include on their project
team? Check the four that apply.
-Environmental engineer
-MEP engineer
-Construction manager
-Civil engineer
-Landscape architect
-Site surveyor
Give this one a try later!
, -Environmental engineer
-MEP engineer
-Civil engineer
-Landscape architect
Explanation: Because the project will be located in a wetland and will
require expertise in evaluating and designing for this type of environment.
Because a laboratory building will require specialty expertise in
mechanical, electrical, and plumbing. Because the project is located in a
wetland and will require expertise in how to bring road and infrastructure
to the site.Because the site around the building must be landscaped to
meet local codes and ordinances.
Topic: Resource Management
Early in the construction document phase of a building renovation project, a
mechanical engineer alerts the project manager that the architect has improperly
classified the use of the space. The architect will need to revise the use of the space
so that the mechanical engineer can correctly size a large portion of the HVAC
system and revise the distribution duct layout.
What should the architect do first to address the improper classification?
a)Submit a request for additional services.
b)Take corrective actions to modify the project work plan.
c)Identify the impact on the previous construction cost estimate.
d)Advise the owner of the design conditions and their impact on the schedule.
Give this one a try later!
, b) take corrective actions to modify the project work plan.
Explanation: Taking corrective action if a project is not performing
according to the project work plan is the first step the architect should take.
The architect should identify the root cause for the error and define a path
forward to resolving it prior to discussion with the owner.
Topic: Project Work Planning
An architect hires a structural engineer consultant for a new condominium project.
Five days before the design document drawings are due, the owner requests that a
rooftop garden and patio be included in the project. The structural engineer sends an
e-mail to the architect, requesting additional time and compensation for the
incorporation of the new roof modifications.
If an e-mail is an approved form of documentation according to the consultant
contract, what action should the architect take?
a)Forward the e-mail request with a description to the owner for review and approval.
b)Attach the e-mail to the owner's design document deliverables and invoice for
payment.
c)Reply to the e-mail asking the engineer to send their request to the architect in the
form of a letter.
Give this one a try later!
a wetland site. The site includes new road access and must be designed to meet local
codes and ordinances.
Which of the following subconsultants should the architect include on their project
team? Check the four that apply.
-Environmental engineer
-MEP engineer
-Construction manager
-Civil engineer
-Landscape architect
-Site surveyor
Give this one a try later!
, -Environmental engineer
-MEP engineer
-Civil engineer
-Landscape architect
Explanation: Because the project will be located in a wetland and will
require expertise in evaluating and designing for this type of environment.
Because a laboratory building will require specialty expertise in
mechanical, electrical, and plumbing. Because the project is located in a
wetland and will require expertise in how to bring road and infrastructure
to the site.Because the site around the building must be landscaped to
meet local codes and ordinances.
Topic: Resource Management
Early in the construction document phase of a building renovation project, a
mechanical engineer alerts the project manager that the architect has improperly
classified the use of the space. The architect will need to revise the use of the space
so that the mechanical engineer can correctly size a large portion of the HVAC
system and revise the distribution duct layout.
What should the architect do first to address the improper classification?
a)Submit a request for additional services.
b)Take corrective actions to modify the project work plan.
c)Identify the impact on the previous construction cost estimate.
d)Advise the owner of the design conditions and their impact on the schedule.
Give this one a try later!
, b) take corrective actions to modify the project work plan.
Explanation: Taking corrective action if a project is not performing
according to the project work plan is the first step the architect should take.
The architect should identify the root cause for the error and define a path
forward to resolving it prior to discussion with the owner.
Topic: Project Work Planning
An architect hires a structural engineer consultant for a new condominium project.
Five days before the design document drawings are due, the owner requests that a
rooftop garden and patio be included in the project. The structural engineer sends an
e-mail to the architect, requesting additional time and compensation for the
incorporation of the new roof modifications.
If an e-mail is an approved form of documentation according to the consultant
contract, what action should the architect take?
a)Forward the e-mail request with a description to the owner for review and approval.
b)Attach the e-mail to the owner's design document deliverables and invoice for
payment.
c)Reply to the e-mail asking the engineer to send their request to the architect in the
form of a letter.