Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 29 páginas
Examen

VA DEQ SWM INSPECTOR ACTUAL EXAM PREP 2026 ALL QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK |NEW AND REVISED

Document preview thumbnail
Vista previa 3 fuera de 29 páginas

VA DEQ SWM INSPECTOR ACTUAL EXAM PREP 2026 ALL QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK |NEW AND REVISED

Vista previa del contenido

1|P a g e



VA DEQ SWM INSPECTOR ACTUAL EXAM
PREP 2026 ALL QUESTIONS AND CORRECT
DETAILED ANSWERS ALREADY A GRADED
WITH EXPERT FEEDBACK |NEW AND
REVISED

The Virginia Stormwater Management Program is authorized by the
______ and administered through the ______ - ANSWER- Virginia
Stormwater Management Act, Virginia Stormwater Management
Program Regulation


A locality VSMP authority must include enforcement authority and a
schedule of civil penalties for enforcement actions in its local ordinance.
The maximum penalty the authority may issue is - ANSWER- $32,500
per violation per day


Any civil penalty assessed by a court as a result of a summons issued by
a locality VSMP authority must be paid - ANSWER- into the locality's
treasury


Any person who violates..... shall be subject to a civil penalty not to
exceed - ANSWER- $32, 500


Chesapeake Bay Preservation Areas that result in a land disturbance
greater than or equal to ____ and less than ____ - ANSWER- 2,500 ft^2,
1 acre

,2|P a g e




CBPA LDAs must have - ANSWER- approved E&SC plan, approved
SWM plan, local approval to start land disturbance, long-term
maintenance agreement, construction record drawings


CBPA LDAs do not require - ANSWER- Construction GP, Pollution
prevention Plan, Additional control measures to address TMDL


State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER-
must, may


Name the 5 steps in order of the permitting process - ANSWER-
submittal of ESC plans and SWM plans, SWM plan review and
approval, registration statement entry into Construction GP,
Construction GP approved by DEQ, Locality VSMP authority approval
to start land disturbance


The locality VSMP authority has ___ days to determine the
completeness of a stormwater management plan and to notify the
applicant of its determination - ANSWER- 15


If the plan is complete and the applicant has been notified within 15 days
of submission, the locality VSMP authority (plan reviewer) has ___ days
from the time of notification to review the plan - ANSWER- 60

, 3|P a g e


Operators of a single-family detached residential structures that disturb
equal to or greater than one acre of land are - ANSWER- not required to
submit a registration statement


VSMP authority must keep project records, including approved SWM
plans and registration statements, for ___ years after state permit
termination or project completion - ANSWER- 3 years


VSMP authority must keep post construction stormwater management
facility inspection records for __ years from the date of inspection -
ANSWER- 5


DEQ is required to conduct a program review once every - ANSWER- 5
years


A locality VSMP must be at least as stringent as what state permit? -
ANSWER- Construction GP


What plans must a locality's ordinance require to be submitted and
approved? - ANSWER- ESC plan, SWM plan


The Construction GP includes ___ different inspection frequencies -
ANSWER- 2


SWPPP inspection schedule if discharging to impaired waters -
ANSWER- at least once every 4 business days or at least once every 5

Información del documento

Subido en
27 de julio de 2026
Número de páginas
29
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$23.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
impressivetutor
4.8
(1821)
Vendido
666
Seguidores
377
Artículos
3729
Última venta
13 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes