Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED ANSWERS,100%CORRECT

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED ANSWERS False - CORRECT ANSWER T/F If price is part of the final selection criteria and the price is the totla cost of construction is not 100% the final and sole selection criteria, then delivery method is Best Value: Total Cost True - CORRECT ANSWER T/F Some industry participants use the term contract type to mean the basis of reimbursement and others use the term to refer to the project delivery method. True - CORRECT ANSWER T/F Basic philosophy of lean construction is centered on the idea of eliminating waste. Low Bid - CORRECT ANSWER Which Procurement option is defined as "competition where price is a factor in the final selection criteria?" Target Price or estimated maximum price - CORRECT ANSWER What basis of reimbursement typically used with IPD? QBS - CORRECT ANSWER Which procurement method is typically used when selecting an Agent Cm firm? True - CORRECT ANSWER T/F Agency CM firms may coordinate, receive, and award trade bids and proposals for the owner. False - CORRECT ANSWER T/F Surety bonds such as payment bonds and performance bonds in the const. industry are considered to be the same as insurance

Vista previa del contenido

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED
ANSWERS
False - CORRECT ANSWER T/F If price is part of the final selection criteria and the
price is the totla cost of construction is not 100% the final and sole selection
criteria, then delivery method is Best Value: Total Cost


True - CORRECT ANSWER T/F Some industry participants use the term contract
type to mean the basis of reimbursement and others use the term to refer to the
project delivery method.


True - CORRECT ANSWER T/F Basic philosophy of lean construction is centered on
the idea of eliminating waste.


Low Bid - CORRECT ANSWER Which Procurement option is defined as
"competition where price is a factor in the final selection criteria?"


Target Price or estimated maximum price - CORRECT ANSWER What basis of
reimbursement typically used with IPD?


QBS - CORRECT ANSWER Which procurement method is typically used when
selecting an Agent Cm firm?


True - CORRECT ANSWER T/F Agency CM firms may coordinate, receive, and award
trade bids and proposals for the owner.

, False - CORRECT ANSWER T/F Surety bonds such as payment bonds and
performance bonds in the const. industry are considered to be the same as
insurance


True - CORRECT ANSWER T/F Case evaluation involves a neutral third party or
facilitator that is not empowered to make a decision on the dispute


-May be used in DBB
-May be used in DB
May be used when selecting designer/constructor
- One process for procurement, RFQ/RFP, has it built into the processs
-May be used with IPD
-May be used w/ CM at risk - CORRECT ANSWER Which statement(s) are true
regarding prequalifications?


False - CORRECT ANSWER T/F Lump Sum of Fixed Firm Price are generally open-
book with the owner having access to the contractor's or design-builder's cost
related info


- Locating temp. facilities for project team members
- Identifying and facilitating long lead item orders
- Coordinate, receive and award trade bids and proposals
- Help Owner obtain permits and gov. approvals
- Help owner obtain consultants - CORRECT ANSWER Which of the following
services may be provided by an Agent CM firm?

Información del documento

Subido en
26 de julio de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
paulhans
3.5
(136)
Vendido
796
Seguidores
641
Artículos
7840
Última venta
6 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes