Correct
2.5/2.5 Points
1.Based on Scenario Part I, answer the following six questions (questions 1 to
6):

One of the JUPSA Key Performance Parameter (KPP) requirements does not
appear to be achievable without significant cost impacts. The PM is planning
to recommend a change to this validated requirement since it is not clear that
the additional costs are worth the capability added. Who would have to
approve this Acquisition Category (ACAT) | KPP change?

Scenario Part 1. The Program Officeis busy preparing the joint, Unmanned
ision Strike A|r-Veh|cIe (JUPSA) for Milestone B, seeking approval to
g and Manufacturlng Development (EMD) phase
activities. Affordability is a keyissue since estimated operating and support
costs are higher than what was estimated at Milestone A. In accordance with
the test and evaluation master plan (TEMP), JUPSA conducted developmental
tests and early operational assessments to support the upcoming Milestone B
decision. Test planning for the EMD phase efforts is ongoing. Congressional
interest is very high since JUPSA is an ACAT I, Major Defense Acquisition
Program (MDAP) and has suppliers in nearly every state. As an MDAP
an Independent Cost Estimate(ICE) and an Independent Technical Risk
Assessment (ITRA) were conducted. Meanwhile at least one country has
expressed an interest in Foreign Military Sales (FMS)as soon as possible. The
JUPSA program is not considered by the Milestone Decision Authority to be a
high cost first article acquisition program.
- Under Secretary of Defense for Acquisition and Sustainment USD(A&S)
«
- Joint
Requirements
Oversight Council (JROC)
0




Milestone Decision Authority (MDA)

c Program Executive Officer (PEO)
Correct
2.5/2.5 Points
2.Which of the following is NOT an activity that will be conducted during the
Engineering and Manufacturing Development (EMD) phase for the JUPSA
program?
Scenario Part 1. The Program Officeis busy preparing the joint, Unmanned
ision Strike Air-Vehicle (JUPSA) for Milestone B, seeking approval to
conduct the Engineering and Manufacturlng Development (EMD) phase
activities. y is a keyissue since estimated operating and support
costs are higher than what was estimated at Milestone A. In accordance with
the test and evaluation master plan (TEMP), JUPSA conducted developmental
tests and early operational assessments to support the upcoming Milestone B
decision. Test planning for the EMD phase efforts is ongoing. Congressional
interest is very high since JUPSA is an ACAT I, Major Defense Acquisition
Program (MDAP) and has suppliers in nearly every state. As an MDAP
an Independent Cost Estimate(ICE) and an Independent Technical Risk
Assessment (ITRA) were conducted. Meanwhile at least one country has
expressed an interest in Foreign Military Sales (FMS)as soon as possible. The
JUPSA program is not considered by the Milestone Decision Authority to be a
high cost first article acquisition program.

, G Build/test prototype or first articles to verify compliance with requirements
c Demonstration that all sources of risk have been adequately retired
o
- Complete hardware (H/W) and software (S/W) detailed design
Correct
2.5/2.5 Points
3.You have worked hard to balance the acquisition, production, and
sustainment of required capabilities to meet the JUPSA affordability goals
established at Milestone A. However, the current JUPSA Operating and
Support (O&S) cost estimate is higher than the initial goal. In accordance
with DoDI 5000.85, which of the following is FALSE regarding affordability of
the program at development RFP (Request for Proposal) release dec n and
Milestone B?
Scenario Part 1. The Program Office is busy preparing the joint, Unmanned
Precision Strike Air-Vehicle (JUPSA) for Milestone B, seeking approval to
conduct the Engineering and Manufacturing Development (EMD) phase
activities. Affordability is a key issue since estimated operating and support
costs are higher than what was estimated at Milestone A. In accordance with
the test and evaluation master plan (TEMP), JUPSA conducted developmental
tests and early operational assessments to support the upcoming Milestone B
decision. Test planning for the EMD phase efforts is ongoing. Congressional
interest is very high since JUPSA is an ACAT I, Major Defense Acquisition
Program (MDAP) and has suppliers in nearly every state. As an MDAP
an Independent Cost Estimate(ICE) and an Independent Technical Risk
Assessment (ITRA) were conducted. Meanwhile at least one country has
expressed an interest in Foreign Military Sales (FMS)as soon as possible. The
JUPSA program is not considered by the Milestone Decision Authority to be a
high cost first article acquisition program.
c Appropriate trade-offs among cost, schedule, technical feasibility, and performance
objectives have been made to ensure that the program is affordable when considering
the per unit cost and the total life-cycle cost before Milestone B approval is granted
pursuant to Section 2366b of Title 10, U.S.C.

_
G Compliance with affordability/program goals demonstrated through technical
assessments and Independent Cost Estimate (ICEs) are required for Major Defense
Acquisition Programs (MDAPs)

G The purpose of the Development RFP release decision point is to ensure, prior to the
release of the solicitation for EMD, that an executable and affordable program has been
planned using a sound business and technical approach.
Correct
2.5/2.5 Points
4.What kind of operational testing should the lead Operational Test Agency
(OTA) plan to conduct during the Engineering and Manufacturing
Development (EMD) phase, and what decision will the test results support?
(Note: Program is following DoDI 5000.85 for this increment, and T&E
oversight under the DOT&E (Director Operational Test and Evaluation) who
will provide the MDA with milestone assessments.)

Escuela, estudio y materia

Institución
PMT 3600V
Grado
PMT 3600V

Información del documento

Subido en
24 de julio de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LUCIDWISE Concordia College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
2 año
Número de seguidores
6
Documentos
848
Última venta
1 semana hace

FEEL FREE TO INBOX

4.7

213 reseñas

5
174
4
21
3
11
2
2
1
5

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes