Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

PMP CERTIFICATION EXAM ACTUAL PAPER 2026 QUESTIONS WITH SOLUTIONS GRADED A PLUS COMPLETE REVIEW SET 800 ITEMS

Puntuación
-
Vendido
-
Páginas
80
Grado
A+
Subido en
22-07-2026
Escrito en
2025/2026

PMP CERTIFICATION EXAM ACTUAL PAPER 2026 QUESTIONS WITH SOLUTIONS GRADED A PLUS COMPLETE REVIEW SET 800 ITEMS

Institución
PMP
Grado
PMP

Vista previa del contenido

PMP CERTIFICATION EXAM ACTUAL PAPER
2026 QUESTIONS WITH SOLUTIONS GRADED
A PLUS COMPLETE REVIEW SET 800 ITEMS

◉ Planned Value (PV).
Answer: The portion of the approved total cost estimate planned to
be spent on an activity during a given period. Planned % Complete x
BAC


◉ Actual Cost (AC).
Answer: The realized cost incurred for the work performed on an
activity during a specific time period.


◉ Budget at Completion (BAC).
Answer: The sum of all budgets established for the work to be
performed.


◉ Estimate to Complete (ETC).
Answer: The expected cost to finish all the remaining project work.
EAC - AC


◉ Estimate at Completion (EAC).

,Answer: The expected total cost of completing all work expressed as
the sum of the actual cost to date and the estimate to complete. BAC
/ CPI


◉ Cost Performance Index (CPI).
Answer: A measure of the cost efficiency of budgeted resources
expressed as the ratio of earned value to actual cost. EV / AC


◉ Schedule Performance Index (SPI).
Answer: A measure of schedule efficiency expressed as the ratio of
earned value to planned value. EV / PV


◉ To-Complete Performance Index (TCPI).
Answer: A measure of the cost performance that is required to be
achieved with the remaining resources in order to meet a specified
management goal, expressed as the ratio of the cost to finish the
outstanding work to the remaining budget. (BAC - EV) / (BAC - AC)


◉ Cost Variance (CV).
Answer: EV - AC
Negative is over budget; positive is under budget


◉ Schedule Variance (SV).
Answer: EV - PV

,Negative is behind schedule; positive is ahead of schedule


◉ Variance at Completion (VAC).
Answer: A projection of the amount of budget deficit or surplus,
expressed as the difference between the budget at completion and
the estimate at completion. BAC - EAC


◉ Economic Value Added (EVA).
Answer: Net operating profit after taxes minus (capital x cost of
capital); a measure of the economic value of an investment or
project


◉ Future Value (FV).
Answer: the value of future cash flows discounted at the appropriate
discount rate FV = PV(1+r)^n


◉ Return on Invested Capital (ROIC).
Answer: Net income after tax / Invested Tax (smaller is better)


◉ Order of Magnitude Estimate.
Answer: A high-level estimate of the time and cost of a project based
on the actual cost and duration of a similar project. -50% to +100%

, ◉ Conceptual Estimate.
Answer: a cost estimate based on very little design information and
using gross unit pricing to determine the project cost. -30% to +50%


◉ Preliminary Estimate.
Answer: -20% to +30% estimate range


◉ Definitive Estimate.
Answer: -15% to +20% estimate range


◉ Control Estimate.
Answer: -10% to +15% estimate range


◉ Delphi Technique.
Answer: A decision-making technique in which group members do
not meet face-to-face but respond in writing to questions posed by
the group leader. Prevents biasing opinions and groupthink.


◉ Nominal Group Technique.
Answer: Brainstormed ideas are voted upon and sorted by priority


◉ Scope Baseline.

Escuela, estudio y materia

Institución
PMP
Grado
PMP

Información del documento

Subido en
22 de julio de 2026
Número de páginas
80
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GradeGalaxy Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
124
Miembro desde
8 meses
Número de seguidores
2
Documentos
43042
Última venta
1 día hace
GradeGalaxy

Welcome to the premier destination for high-quality academic support. GradeGalaxy7 provides a comprehensive suite of educational materials, including expertly sourced test banks, solution manuals, and study guides. Our resources are meticulously organized to streamline your revision process and enhance your understanding of core concepts. Equip yourself with the reliable content you need to achieve superior academic results.

4.4

8 reseñas

5
5
4
1
3
2
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes