Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

PMT 3600V Exam 2 | Questions and Answers | Latest Update with complete solution

Puntuación
-
Vendido
-
Páginas
12
Grado
A+
Subido en
22-07-2026
Escrito en
2025/2026

PMT 3600V Exam 2 | Questions and Answers | Latest Update with complete solution

Institución
PMT 3600V
Grado
PMT 3600V

Vista previa del contenido

PMT 3600V Exam 2|Questions and
Answers|Latest Update with complete solution
Correct
2.5/2.5 Points
1. Based on Scenario Part I, answer the following six questions (questions 1 to
6):

One of the JUPSA Key Performance Parameter (KPP) requirements does not
appear to be achievable without significant cost impacts. The PM is planning
to recommend a change to this validated requirement since it is not clear that
the additional costs are worth the capability added. Who would have to
approve this Acquisition Category (ACAT) I KPP change?

Scenario Part I. The Program Office is busy preparing the joint, Unmanned
Precision Strike Air-Vehicle (JUPSA) for Milestone B, seeking approval to
conduct the Engineering and Manufacturing Development (EMD) phase
activities. Affordability is a key issue since estimated operating and support
costs are higher than what was estimated at Milestone A. In accordance with
the test and evaluation master plan (TEMP), JUPSA conducted developmental
tests and early operational assessments to support the upcoming Milestone B
decision. Test planning for the EMD phase efforts is ongoing. Congressional
interest is very high since JUPSA is an ACAT I, Major Defense Acquisition
Program (MDAP) and has suppliers in nearly every state. As an MDAP
an Independent Cost Estimate(ICE) and an Independent Technical Risk
Assessment (ITRA) were conducted. Meanwhile at least one country has
expressed an interest in Foreign Military Sales (FMS)as soon as possible. The
JUPSA program is not considered by the Milestone Decision Authority to be a
high cost first article acquisition program.
Under Secretary of Defense for Acquisition and Sustainment USD(A&S)
Joint Requirements Oversight Council (JROC)
Milestone Decision Authority (MDA)
Program Executive Officer (PEO)
Correct
2.5/2.5 Points
2. Which of the following is NOT an activity that will be conducted during the
Engineering and Manufacturing Development (EMD) phase for the JUPSA
program?
Scenario Part I. The Program Office is busy preparing the joint, Unmanned
Precision Strike Air-Vehicle (JUPSA) for Milestone B, seeking approval to
conduct the Engineering and Manufacturing Development (EMD) phase
activities. Affordability is a key issue since estimated operating and support
costs are higher than what was estimated at Milestone A. In accordance with
the test and evaluation master plan (TEMP), JUPSA conducted developmental
tests and early operational assessments to support the upcoming Milestone B
decision. Test planning for the EMD phase efforts is ongoing. Congressional
interest is very high since JUPSA is an ACAT I, Major Defense Acquisition
Program (MDAP) and has suppliers in nearly every state. As an MDAP
an Independent Cost Estimate(ICE) and an Independent Technical Risk
Assessment (ITRA) were conducted. Meanwhile at least one country has
expressed an interest in Foreign Military Sales (FMS)as soon as possible. The
JUPSA program is not considered by the Milestone Decision Authority to be a
high cost first article acquisition program.

, Capability y Development y Document y (CDD) y initial y validation
Build/test yprototype yor yfirst yarticles yto yverify ycompliance ywith yrequirements
Demonstration ythat yall ysources yof yrisk yhave ybeen yadequately yretired
yComplete yhardware y(H/W) yand ysoftware y(S/W) ydetailed ydesign

Correct
2.5/2.5 yPoints
3. You yhave yworked yhard yto ybalance ythe yacquisition, yproduction, yand
ysustainment yof yrequired ycapabilities yto ymeet ythe yJUPSA yaffordability ygoals

yestablished yat yMilestone yA. yHowever, ythe ycurrent yJUPSA yOperating yand

ySupport y(O&S) ycost yestimate yis yhigher ythan ythe yinitial ygoal. y In yaccordance

ywith yDoDI y5000.85, ywhich yof ythe yfollowing yis yFALSE yregarding yaffordability

yof ythe yprogram yat ydevelopment yRFP y(Request yfor yProposal) yrelease

ydecision yand yMilestone yB?

Scenario yPart yI. yThe yProgram yOffice yis ybusy ypreparing ythe yjoint, yUnmanned
yPrecision yStrike yAir-Vehicle y(JUPSA) yfor yMilestone yB, yseeking yapproval yto

yconduct ythe yEngineering yand yManufacturing yDevelopment y(EMD) yphase

yactivities. Affordability yis ya ykey yissue ysince yestimated yoperating yand
ysupport ycosts yare yhigher ythan ywhat ywas yestimated yat yMilestone yA. yIn

yaccordance ywith ythe ytest yand yevaluation ymaster yplan y(TEMP), yJUPSA

yconducted ydevelopmental ytests yand yearly yoperational yassessments yto

ysupport ythe yupcoming yMilestone yB ydecision. yTest yplanning yfor ythe yEMD

yphase yefforts yis yongoing. yCongressional yinterest yis yvery yhigh ysince yJUPSA yis

yan yACAT yI, yMajor yDefense yAcquisition yProgram y(MDAP) yand yhas ysuppliers yin

ynearly yevery ystate. yAs yan yMDAP

an yIndependent yCost yEstimate(ICE) yand yan yIndependent yTechnical yRisk
yAssessment y(ITRA) ywere yconducted. yMeanwhile yat yleast yone ycountry yhas

yexpressed yan yinterest yin yForeign yMilitary ySales y(FMS)as ysoon yas ypossible. yThe

yJUPSA yprogram yis ynot yconsidered yby ythe yMilestone yDecision yAuthority yto ybe ya

yhigh ycost yfirst yarticle yacquisition yprogram.


Appropriate ytrade-offs yamong ycost, yschedule, ytechnical yfeasibility, yand
yperformance yobjectives yhave ybeen ymade yto yensure ythat ythe yprogram yis yaffordable
ywhen yconsidering ythe yper yunit ycost yand ythe ytotal ylife-cycle ycost ybefore yMilestone yB

yapproval yis ygranted ypursuant yto ySection y2366b yof yTitle y10, yU.S.C.


Affordability yis yapplicable yonly yto yprocurement yof ythe ysystem, ynot yto yfuture yO&S
y costs.
Compliance ywith yaffordability/program ygoals ydemonstrated ythrough ytechnical
yassessments yand yIndependent yCost yEstimate y(ICEs) yare yrequired yfor yMajor yDefense
yAcquisition yPrograms y(MDAPs)


The ypurpose yof ythe yDevelopment yRFP yrelease ydecision ypoint yis yto yensure, yprior yto
ythe yrelease yof ythe ysolicitation yfor yEMD, ythat yan yexecutable yand yaffordable yprogram yhas
ybeen yplanned yusing ya ysound ybusiness yand ytechnical yapproach.

Correct
2.5/2.5 yPoints
4. What ykind yof yoperational ytesting yshould ythe ylead yOperational yTest
yAgency y(OTA) yplan yto yconduct yduring ythe yEngineering yand yManufacturing

yDevelopment y(EMD) yphase, yand ywhat ydecision ywill ythe ytest yresults

ysupport? y(Note: yProgram yis yfollowing yDoDI y5000.85 yfor ythis yincrement,

yand yT&E yoversight yunder ythe yDOT&E y(Director yOperational yTest yand

yEvaluation) ywho ywill yprovide ythe yMDA ywith ymilestone yassessments.)

Escuela, estudio y materia

Institución
PMT 3600V
Grado
PMT 3600V

Información del documento

Subido en
22 de julio de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Wisdoms Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
757
Miembro desde
2 año
Número de seguidores
65
Documentos
6970
Última venta
3 días hace
REALITIEXAM:

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact :

4.5

305 reseñas

5
228
4
36
3
17
2
12
1
12

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes