Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CON 1300 Test Review Questions with Clear Rationales (2026/2027)

Puntuación
-
Vendido
-
Páginas
33
Grado
A+
Subido en
21-07-2026
Escrito en
2025/2026

This document contains questions and verified answers for CON 1300 Test Review . It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Institución
CON 1300
Grado
CON 1300

Vista previa del contenido

CON 1300 Test Review

A _____ is a reaction to a solicitation that, if ordinary, would _____ the offeror to carry out the
resultant settlement.

1. Offer

2. Bind




These offer reaction kinds are taken into consideration binding offers:

1. Bid

2. Offer/Proposal




A _____ is not an offer as it does now not bind the contractor to carry out a mission.

Quote




_____ are used to solicit in simplified acquisition tactics. Reponses to this solicitation come
inside the form of a _____. It is vital to take into account that this reaction _____ considered a
proposal and _____ binding. Far reference: ______

1. Requests for quotations (RFQ)

2. Quote

three. Is NOT

four. Is NOT

5. Part thirteen

,_____ are used to solicit within sealed bidding strategies. Reponses to this solicitation come in
the form of a _____. It is important to don't forget that this reaction _____ considered a
suggestion and _____ binding. Far reference: _____

1. Invitations for bids (IFB)

2. Bid

3. Is

4. Is

five. Part 14




_____ are used to solicit within agreement via negotiation processes. Reponses to this
solicitation come inside the form of a _____. It is vital to do not forget that this reaction _____
considered a proposal and _____ binding. Far reference: _____

1. Requests for Proposal (RFP)

2. Proposal

three. Is

four. Is

five. Part 15




Trade-off proposals consist of and are taken into consideration by _____, _______, and ______
parameters.

1. Technical

2. Cost/Price

three. Past Performance




True or False. A quotation is taken into consideration an offer?

,False : A Quote is not a proposal as it does now not bind the contractor to carry out a task.




An offer for a RFQ beneath FAR subpart eight.4 is a _____.

Purchase Order




The Lowest Price Technically Acceptable (LPTA) includes:
1. Evaluation elements and sub elements shall be inside the solicitation

2. Based on Lowest Price and Technically Acceptable Offer

three. Solicitations shall specify that award may be made on basis of LPTA




Tradeoffs Include or are guided by means of:
1. Characteristics of the tradeoff technique: FAR 15.One hundred and one-1

2. Permits tradeoffs amongst price and price and non-value factors

three. Allows Government to simply accept aside from the lowest priced thought

4. Awarding to better priced proposal have to advantage the additional value

five. Rationale for tradeoffs must be documented within the record




What is the definition of contract chance?
“a measure of future uncertainties in reaching software goals and objectives within described
cost, agenda, and performance constraints.”




What are the three key chance factors of a agreement?
1. Cost

2. Schedule

three. Performance

, _____ and _____ are two ways to mitigate danger. They are carefully associated and need to
be considered collectively.

1. Contract type

2. Contract pricing




_____ is the hazard that sports will take longer than anticipated, and is typically the result of
negative making plans or unexpected situations.

Schedule chance




_____ is an escalation of assignment prices. It is the risk that the assignment will fee greater
than the budget allotted for it. Perhaps the maximum common task chance, fee threat is due to
terrible finances making plans, faulty fee estimating, and scope creep.

Cost threat




_____ is the danger that the assignment will fail to provide outcomes steady with challenge
specifications.

Performance threat




Schedule Risk Mitigation by agreement type:

1. Fixed Price contracts = contractor have to carry out and meet the _____.

2. Cost Reimbursement contracts = contractor will perform their _____.

1. Transport agenda

2. “exceptional attempt”

Escuela, estudio y materia

Institución
CON 1300
Grado
CON 1300

Información del documento

Subido en
21 de julio de 2026
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
lennieamayah

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
lennieamayah Howard community college
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
-
Miembro desde
6 días
Número de seguidores
0
Documentos
247
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes