Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 25 páginas
Examen

Florida Business and Finance Practice Test | Complete Verified Exam Questions, Correct Answers & Rationales - Latest Updated Exam 2026/2027

Document preview thumbnail
Vista previa 3 fuera de 25 páginas

Get fully prepared and pass the Florida Business and Finance Exam on your first try with this complete 2026/2027 practice test guide! Packed with verified exam questions, correct answers, and detailed rationales covering essential topics including owner financial capability timelines, maintaining contract documents on site, consequences of unlicensed contracting, bid procedures, AIA standards, project management requirements, and Florida-specific construction business regulations. Ideal for contractors, qualifiers, and candidates pursuing or renewing their Florida state contractor license. This high-yield resource helps you master the business and finance section and confidently ace the exam. Updated, accurate, and already proven effective — your ultimate study companion for success!

Vista previa del contenido

Florida Business and Finance Practice
Test | Complete Verified Exam
Questions, Correct Answers & Rationales
- Latest Updated Exam 2026/2027

Question 1
The owner must prove financial capability no later than ________ days prior to the
expiration of the time for withdrawal of bids.
A. 3
B. 5
C. 7
D. 30
Answer: C
Rationale: Per AIA 701.6.2, the owner must prove financial capability at least 7 days
prior to the expiration of the bid withdrawal period.


Question 2
How many copies of the plans and specifications shall the contractor maintain on site?
A. 1
B. 2
C. 3
D. 4
Answer: A
Rationale: Per AIA 201 2.3.6, the contractor shall maintain at least one copy of the
plans and specifications on the project site.


Question 3
Contracts entered into by unlicensed contractors ________________.
A. Are immoral
B. Are illegal



pg. 1

,C. Are enforceable
D. Are unenforceable
Answer: D
Rationale: Per CM 2-94 489.128, contracts entered into by unlicensed contractors are
unenforceable. The unlicensed contractor cannot recover payment for work performed.


Question 4
The subcontractor agrees that all work shall be done subject to the final approval of the
______________________.
A. Architect
B. Contractor
C. Both A & B are correct
D. None of the above
Answer: C
Rationale: Per AIA 401.4.2.5, all subcontractor work is subject to the final approval of
both the architect and the contractor.


Question 5
Which of the following is NOT exempt from chapter 489?
A. An employee of a licensee who is subordinate of a construction licensee acting within
the scope
B. Owners of a property with a cost of $85,000
C. Contractors in work on bridges and roads
D. Anybody doing work of a minor nature - less than $1,000 or less
Answer: B
Rationale: Per CM 2-63 489.103, the exemption limit for property owners is $75,000,
not $85,000. Therefore, an owner with an $85,000 project is NOT exempt from Chapter
489.


Question 6
The architect has the sole responsibility for ordering __________________.
A. Change orders
B. Construction change directives
C. Any minor change in work
D. Any changes whatsoever
pg. 2

, Answer: C
Rationale: Per AIA 201 7.1.2, the architect has the sole responsibility for ordering any
minor change in the work.


Question 7
When considering the location of your office, which of the following is not a
consideration?
A. Zoning Ordinances
B. Demographic makeup of community
C. Building Permits
D. Flood Prone Area Maps
Answer: B
Rationale: Demographic makeup is not a primary consideration for office location
when planning construction. Zoning ordinances, building permits, and flood maps are
all regulatory considerations.


Question 8
The bonding cost for a class "B" contract of $900,000 will cost ________________.
A. $9,000
B. $10,000
C. $12,500
D. $22,500
Answer: C
Rationale: CM 4-18 Graduated scale:
• First $100,000 × 25% = $2,500
• Next $400,000 × 15% = $6,000
• Remaining $400,000 × 10% = $4,000
• Total = $12,500


Question 9
A project is to be considered abandoned after _________ days if the contractor just
terminates the project without notification to the owner and without cause.
A. 30

pg. 3

Información del documento

Subido en
18 de julio de 2026
Número de páginas
25
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExamsWizard
4.1
(32)
Vendido
139
Seguidores
12
Artículos
910
Última venta
15 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes