Cost of parking, drives, fences, landscaping, exterior lighting, and irrigation systems.


Give this one a try later!


Site Development Costs




Costs of movable equipment, furnishings, accessories, and window coverings.


Give this one a try later!


Furniture, Fixtures, and Equipment (FF&E)




Includes the standard building code check by the authority having jurisdiction (AHJ)
as well as any other reviews by permitting agencies.

,Give this one a try later!


Agency Review




A building with occupied floors more than 75ft above the lowest level of fire
department vehicle access.


Give this one a try later!


High-Rise Building




The formalized form of mutual understanding about what the architect will do and
what the client will give in return for services rendered.


Give this one a try later!


Contract Documents




Instructs the contractor to proceed with the stated changes in the work, even if the
contractor does not agree with the basis for adjustment in contract sum or contract
time.


Give this one a try later!


Construction Change Directive

,The distance that an occupant would have to travel to get from the most remote point
in the occupied portion of the exit access area, along the natural and unobstructed
path of horizontal and vertical travel, to the entrance to the nearest exit.


Give this one a try later!


Exit Access Travel Distance




Required to ensure that the successful bidder will enter into a contract with the owner.


Give this one a try later!


Bid security




The contractor may decide to speed up the work because the work has fallen behind
the original schedule, the construction company is trying to finish early to collect a
bonus, or they want to move personnel to another job.


Give this one a try later!


Voluntary Acceleration




Process that considers more than just the lowest bid cost, but also factors such as
quality, schedule, and contractor personnel.


Give this one a try later!

, Value-Based Selection (VBS)




The fee available to pay people to do the job after subtracting fees for proffit,
consultants and other expenses.


Give this one a try later!


Total Working Fee




A listed device installed in ducts and air transfer openings that is designed to close
automatically on detection of heat, to resist the passage of flame.


Give this one a try later!


Fire Damper




A physical example of a portion of the work, intended to show exactly how a material,
finish, or piece of equipment will look in the completed job.


Give this one a try later!


Sample




In bid documents: set costs for certain portions of work, based on an individual
quantity.

Información del documento

Subido en
17 de julio de 2026
Número de páginas
48
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLASSROOMTEST
3.4
(10)
Vendido
47
Seguidores
2
Artículos
7464
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes