Examen

OPMA 407 PROJECT MANAGEMENT FINAL EXAM QUESTIONS AND ANSWERS STUDY GUIDE 2026/2027 | COMPLETE FINAL REVIEW

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

OPMA 407 PROJECT MANAGEMENT FINAL EXAM QUESTIONS AND ANSWERS STUDY GUIDE 2026/2027 | COMPLETE FINAL REVIEW

Vista previa del contenido

OPMA 407 PROJECT MANAGEMENT FINAL EXAM QUESTIONS AND ANSWERS
STUDY GUIDE 2026/2027 | COMPLETE FINAL REVIEW


What are the 4 stages of a project life cycle? - ANS ✔✔1) Project Formation

2) Project Build-up

3) Main program

4) Project phase-out



What are 5 strategies to deal with conflict? (CACAC) - ANS ✔✔- Competing

- Avoiding

- Collaborating

- Accommodating

- Compromising



MRQ: What are four potential sources of conflict during the project formation stage?



**On final exam** - ANS ✔✔1) Technical objectives not significantly detailed or explained -->
difficult to define, but must be for conflict resolution to begin.



2) Identifying, obtaining, and retaining resources --> easy to make promises that are difficult to
keep later on.



3) Priority of resource use.



4) Selection of project organizational structure to align goals.

,MRQ: What are likely sources of conflict during project build-up, main program, and phase-out?
- ANS ✔✔Build-up - Priorities, scheduling, and administrative processes. Conflict between PM
and functional managers.



Main Program - Schedules, due to delays. Technical conflicts also significant.



Phase-out - Deadlines. Personality conflicts also due to jockeying for recognition.



MRQ: What are the three main requirements of project negotiation? - ANS ✔✔1) No
irreparable harm to project's objectives.



2) Honesty-supported methods between negotiating parties.



3) Solutions must satisfy needs of stakeholders.



MRQ: Describe the 4 points of principled negotiation. - ANS ✔✔1) Separate people from
problem.



2) Focus on interests instead of positions.



3) Invent win-win options.



4) Objective criteria to settle disputes.



MRQ: What is monitoring? What activities are part of monitoring? - ANS ✔✔Collecting,
recording, and reporting information concerning all aspects of project performance.



Monitoring should be kept distinct from controlling and evaluation.

, - WBS = scope + time

- Cost = budget

- Recording data

- Collecting data

- Reporting



MRQ: What are the key factors that need to be considered when setting up a monitoring
system? (5)

**On final exam** - ANS ✔✔1) Elements of scope, time, and cost that the project team should
*control*.



2) Focus on output rather than activity/process. Seek to get the job done.



3) Minimize the use of resource consumption.



4) Appropriate level of precision (detail).



5) Timely, relevant, and consistent information to stakeholders.



MRQ: What are factors that are difficult to monitor? - ANS ✔✔Intangible aspects related to
performance:



- Team morale, customer satisfaction, quality of relationships w/ stakeholders.



MRQ: What is a routine report? - ANS ✔✔A report issued in a predetermined format on a
regular basis.

Información del documento

Subido en
16 de julio de 2026
Número de páginas
23
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Sanchy062
4.1
(26)
Vendido
56
Seguidores
21
Artículos
3091
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes