Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

OPMA 3306 FINAL EXAM REVIEW UTA OPERATIONS MANAGEMENT QUESTIONS AND ANSWERS STUDY GUIDE 2026/2027 | COMPLETE CUMULATIVE TEST PREP

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

OPMA 3306 FINAL EXAM REVIEW UTA OPERATIONS MANAGEMENT QUESTIONS AND ANSWERS STUDY GUIDE 2026/2027 | COMPLETE CUMULATIVE TEST PREP

Vista previa del contenido

OPMA 3306 FINAL EXAM REVIEW UTA OPERATIONS MANAGEMENT QUESTIONS AND
ANSWERS STUDY GUIDE 2026/2027 | COMPLETE CUMULATIVE TEST PREP



A BOM file is also called which of the following - correct answer ✔✔Product Tree



MRP stands for Material Requirements Planning - correct answer ✔✔True



A project can be subdivided into which of the following - correct answer ✔✔work packages



MRP is most valuable where a number of products are made in batches using the same
productive equipment - correct answer ✔✔True



PERT is an abbreviation for which of the following methodologies - correct answer ✔✔Program
Evaluation and Review Technique



How many free trade zones are there in the US - correct answer ✔✔about 260



A master production schedule is an input to a material requirements planning (MRP) system -
correct answer ✔✔True



An input to the material requirements planning (MRP) system is an exception report - correct
answer ✔✔False



Which of the following are eligible companies to be considered for the Baldrige award - correct
answer ✔✔auditing firms



An input to the material requirements planning (MRP) system is an inventory records file -
correct answer ✔✔True

, MRP systems seek to achieve - correct answer ✔✔determine the number of dependent
demand items needed



A modular bill of materials includes items with fractional options - correct answer ✔✔False



An analytical tool used in six-sigma quality improvement programs is which of the following -
correct answer ✔✔checksheets



In monitoring process quality we might use which of the following statistics - correct answer
✔✔difference between the highest and lowest value in a sample



Quality of life in a host community is not a major factor in making the facility location decision -
correct answer ✔✔False



AQL stands for accepting questionable lots in production quality management - correct answer
✔✔False



Net change MRP systems are "activity" driven - correct answer ✔✔True



A BOM file is also called - correct answer ✔✔Product Tree



Which of the following should we use an "R" chart to monitor process quality - correct answer
✔✔tire pressures in an auto assembly plant



In a net change MRP system requirements and schedules are considered rigid and never
updated - correct answer ✔✔False

Información del documento

Subido en
16 de julio de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Sanchy062
4.1
(26)
Vendido
56
Seguidores
21
Artículos
3091
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes