Question:
1. In what project delivery
method is the client least in-
volved?
Answer:
DB
Question:
2. When the architect notices un- Document the unsafe conditions in a memo to the contractor
Answer:
safe working conditions what and cc the owner
should they do?
Question:
3. Which sub consultants report
to the owner?
Answer:
- Facilities Manager
- Geotechnical
Question:
4. Which sub contractors report
to the architect?
Answer:
- Landscape Architect
- Structural
Question:
5. Which sub contractors report
to the contractor?
Answer:
- Window Installer
- Electrical
, Question:
6. When do you prepare a pre-
liminary budget?
Answer:
SD
Question:
7. When do you develop typical DD
Answer:
construction details?
Question:
8. When do you incorporate spe- CD
Answer:
cific design requirements of
the AHJ?
Question:
9. When the architects services
are to be extended due to
mishap site conditions by
the contractor, pushing back
substantial completion, what
must the architect do?
Answer:
- Send an invoice to the owner for additional services
- A notice to the contractor for withholding final payment
Question:
10. What should the contractor
do if one of the owners con-
sultants causes a delay in the
construction schedule?
Answer:
Make a claim for the delay and/or additional cost incurred as a
result
Answers | Latest Updated Study Material 2026
Question:
1. In what project delivery
method is the client least in-
volved?
Answer:
DB
Question:
2. When the architect notices un- Document the unsafe conditions in a memo to the contractor
Answer:
safe working conditions what and cc the owner
should they do?
Question:
3. Which sub consultants report
to the owner?
Answer:
- Facilities Manager
- Geotechnical
Question:
4. Which sub contractors report
to the architect?
Answer:
- Landscape Architect
- Structural
Question:
5. Which sub contractors report
to the contractor?
Answer:
- Window Installer
- Electrical
, Question:
6. When do you prepare a pre-
liminary budget?
Answer:
SD
Question:
7. When do you develop typical DD
Answer:
construction details?
Question:
8. When do you incorporate spe- CD
Answer:
cific design requirements of
the AHJ?
Question:
9. When the architects services
are to be extended due to
mishap site conditions by
the contractor, pushing back
substantial completion, what
must the architect do?
Answer:
- Send an invoice to the owner for additional services
- A notice to the contractor for withholding final payment
Question:
10. What should the contractor
do if one of the owners con-
sultants causes a delay in the
construction schedule?
Answer:
Make a claim for the delay and/or additional cost incurred as a
result