Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

NCARB Exam | Verified Exam Questions and Answers | Latest Updated Study Material 2026

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

NCARB Exam | Verified Exam Questions and Answers | Latest Updated Study Material 2026

Vista previa del contenido

NCARB Exam | Verified Exam Questions and Answers | Latest Updated
Study Material 2026

Question:

1. Black mold is discovered nine
months after building occupancy
and owner informs architect it was
due to improper installation. What 2. Meet with the owner and facilities manager to review
are two actions the architect should operations at no additional cost (Owner can request a
take?
Answer:

1. Instruct the owner to notify the original contractor
about the concern
meeting with the architect to review facility operations
and performance at no additional cost for up to one
year from date of substantial completion per B101)

Question:

2. Underpinning
Answer:

process of rebuilding or strengthening the foundation
of an existing building

Question:

3. The contractor and owner are in a Amend the contract to include a bonus provision to meet
dispute of reasoning behind pro-
ject delays. The owner's primary
concerns are holding to substantial on time. It bypasses the disputed issue of responsibility
completion date in the contract and for delays and focuses efforts on the owner's goal of
avoiding legal proceedings. What
should the architect recommend to
the owner?
Answer:

the stipulated substantial completion date. A bonus is a
viable way of incentivizing a contractor to complete work
meeting the substantial completion date.

, Question:

4. Hard costs of construction, defined concrete repairs, masonry repairs, landscape restora-
Answer:

as cost of materials, labor, and nec- tion
essary equipment

Question:

5. Overhead and Soft costs of con-
struction
Answer:

general conditions, overhead, profit, performance
bond, engineering

Question:

6. Owner visits the site during con-
struction and requests a redesign
of the restrooms without consult-
ing the architect. The contractor be- changes
gins the owner's requested alter-
Answer:

1. Reject change order #1 from contractor
2. Request additional design services from owner
3. Issue revised drawings that include necessary code
ations and submits change order
#1 to the architect. The architect
reviews the modifications at the job
site and identifies code violations
that will require a major redesign.
How should architect proceed?

Question:

7. An architect finds items of noncon- 1. Issue a field observation report listing all rejected
forming work during a construc-
tion site punch walk. Damaged ceil- 2. Determine the source of the nonconforming work in
ing tiles, malfunctioning light fix-
tures, and portions of the rubber
wall base that have not adhered will
all need to be corrected before sub-
stantial completion.

Información del documento

Subido en
16 de julio de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
4027
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes