EK ED
GE OV
ED PR
AP
M
?_
?_ IA
IA UV
UV ST
ST
, TABLE OF CONTENTS
Instructor Manual: Construction Project Management, 5th Edition
Authors: Frederick Gould, Nancy Joyce
ST
??
1. The Construction Industry
2. Project Participants
UV
EK
3. Organizing and Leading the Construction Project
4. Project Delivery Methods
5. Project Chronology
GE
IA
6. Construction Services During Design
7. Bidding and Procurement
8. Construction and Closeout
?_
9. Estimating Project Costs
ED
10. Project Planning and Scheduling
AP
11. Controlling Project Cost, Time, and Quality
_M
12. Project Administration
13. Construction Law
14. Construction Safety and Health
PR
A?
OV
VI
ED
U
ST
??
, Table of Contents
Chapter Quizzes_______________________________________________________________ 01
ST
?
Answers to Chapter Review Questions and Chapter Quizzes____________________________ 25
?
Midterm Exam________________________________________________________________ 31
UV
EK
Answers for Midterm Exam______________________________________________________ 37
Final Exam___________________________________________________________________ 38
GE
IA
Answers for Final Exam_________________________________________________________51
“Real World” Case Solutions_____________________________________________________ 52
?_
ED
Construction Project Management Laboratory Program________________________________ 55
_M AP
PR
A?
OV
VI
ED
U
ST
??
iii
, CHAPTER QUIZZES
CHAPTER 1 QUIZ
ST
1. Construction is defined as a high-risk industry. Why?
?
a. Construction is impacted by outside factors such as government funding.
?
b. Construction is done outside and effected by weather conditions.
UV
c. Most construction projects are custom not benefitted from standardization.
EK
d. All of the above are true.
For questions 2–6, identify in which era the following event/improvement occurred. (Answers are
only used once.)
a. Ancient times 3200 BC to AD 500
GE
IA
b. Middle ages AD 500 to the 14th Century
c. Renaissance 14th Century to 17th Century
d. Industrial Revolution 18th to 19th Century
?_
e. Modern Times 20th and 21st Century
ED
2. Construction of the transcontinental railroad
3. Construction of the Roman aqueducts
AP
4. The invention of the printing press and slide rule
_M
5. The emergence of a project leader separate from the craftsman, architect and engineer
6. The emergence small cities and states fortified by the construction of castles
7. Increased productivity is an important area of focus for the construction industry and can be
PR
achieved by .
a. improving the supply chain
A?
b. improving the management culture
OV
c. more investment in research and development
d. improved safety
VI
e. a, b, c, and d
8. In the construction of the transcontinental railroad which company faced greater logistical
challenges?
ED
U
a. Central Pacific
b. Union Pacific
9. Henry Gantt’s graphical representation of work flow is best characterized as a .
ST
a. CPM diagram
??
b. bar chart
c. P E R T chart
d. work breakdown structure
10. Most young people view a career in construction as highly desirable. True or false?