Certification Test Latest ,recent and
frequently tested exam 4 with
comprehensive questions and verified
accurate solution (detailed &
elaborated) GRADED A+
Professional Academic Assistance Services
Services Offered
Proctored Exam Assistance
Online Class Management (Full Course Support)
Exam Preparation & Study Materials
Assignments and Coursework Support
Essays and Research Papers
Discussion Posts and Replies
, What is the first step of the 5S process? - correct ans:Sort
Which of these activities is considered a non-value-added activity in a lean manufacturing environment?
- correct ans:Moving a product from one station to another
What technology element differentiates Industry 4.0 from Industry 3.0? - correct ans:Smart Sensor
connected to networks
What type of computer is designed to wire directly to input and output devices to control different types
of industrial machines and processes? - correct ans:PLC (Programmable Logic Controller)
What type of manufacturing process do 3D printers perform? - correct ans:Additive
Which of these is NOT a primary goal of a lean manufacturing system? - correct ans:Greater production
volume
What is the normal mode for most PLC-controller industrial machines? - correct ans:Automatic
Which of these is NOT one of the eight types of waste in Lean Manufacturing? - correct
ans:Underproduction
If a machine has a problem that causes it to stop, what would you expect to see on the machine's HMI
panel? - correct ans:Error Messages
Which of these devices includes a display screen and software to display graphical representations of
pushbuttons and selector switches, which an operator can press to send input signals to a controller? -
correct ans:HMI (Human-Machine Interface)
After fixing a problem, what screen should be checked to verify that there are no problems before
starting the machine? - correct ans:Startup Menu