The payment bond is required to ______ an owner under s. 713.23 must
be furnished by the contractor in at least the amount of the original
contract price before commencing the construction of the improvement
under the direct contract. - ANSWER- exempt
A copy the payment bond must be attached to the Notice of
Commencement when it is _______. - ANSWER- recorded
Anyone who willfully files a fraudulent lien as defined in 713.31
commits a felony of the ______ degree - ANSWER- third
When a construction project is "put out" for bid, the contractors are
given the plans and specifications for the project. If any deviations for
these specifications occur, who will be held responsible and may be
required to correct them at their own expense? - ANSWER- The
contractor
The ______ for a protect are interpreted as a legal document that
specifically defines the responsibilities of the owner and his
, 2|Page
representatives intended for the project and what the contractors
responsibilities are. - ANSWER- specifications
The CSI-MASTERFORMAT divides the specifications into
__________ specific divisions to provide a standard reference and filing
numbers for bidding and contract forms. - ANSWER- 50
Which of the following would appear as a heading in the index of the
General Clauses and Conditions sections of General Requirements? -
ANSWER- All of these ( General Conditions, Notice to Bidders and
Proposal)
_________ is the contractors price for performing the work as specified.
- ANSWER- The proposal
"Contract Documents" "Insurance," "payments," and "Guarantee" are
some typical items that would be included under what heading in the
General Clauses and Conditions section? - ANSWER- General
Conditions
The square footage method of estimating is always recommended for
lump-sum contracts. - ANSWER- False
The typical _______ provides the necessary control devices for the
accumulation of estimates into the final bid. - ANSWER- Estimate
summary sheet
FLORIDA ELECTRICAL BUSINESS EXAM 7
CERTIFICATION 2026 ALL QUESTIONS AND
CORRECT DETAILED ANSWERS |ALREADY A
GRADED WITH EXPERT FEEDBACK |NEW AND
REVISED
The payment bond is required to ______ an owner under s. 713.23 must
be furnished by the contractor in at least the amount of the original
contract price before commencing the construction of the improvement
under the direct contract. - ANSWER- exempt
A copy the payment bond must be attached to the Notice of
Commencement when it is _______. - ANSWER- recorded
Anyone who willfully files a fraudulent lien as defined in 713.31
commits a felony of the ______ degree - ANSWER- third
When a construction project is "put out" for bid, the contractors are
given the plans and specifications for the project. If any deviations for
these specifications occur, who will be held responsible and may be
required to correct them at their own expense? - ANSWER- The
contractor
The ______ for a protect are interpreted as a legal document that
specifically defines the responsibilities of the owner and his
, 2|Page
representatives intended for the project and what the contractors
responsibilities are. - ANSWER- specifications
The CSI-MASTERFORMAT divides the specifications into
__________ specific divisions to provide a standard reference and filing
numbers for bidding and contract forms. - ANSWER- 50
Which of the following would appear as a heading in the index of the
General Clauses and Conditions sections of General Requirements? -
ANSWER- All of these ( General Conditions, Notice to Bidders and
Proposal)
_________ is the contractors price for performing the work as specified.
- ANSWER- The proposal
"Contract Documents" "Insurance," "payments," and "Guarantee" are
some typical items that would be included under what heading in the
General Clauses and Conditions section? - ANSWER- General
Conditions
The square footage method of estimating is always recommended for
lump-sum contracts. - ANSWER- False
The typical _______ provides the necessary control devices for the
accumulation of estimates into the final bid. - ANSWER- Estimate
summary sheet