Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

SCMN_4770_EXAM_3_EXAMINATION_TEST_2026_QUESTIONS_WITH_SOLUTIONS.

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

SCMN_4770_EXAM_3_EXAMINATION_TEST_2026_QUESTIONS_WITH_SOLUTIONS.

Vista previa del contenido

SCMN 4770 EXAM 3 EXAMINATION TEST
2026 QUESTIONS WITH SOLUTIONS

◉ what is the difference between "loading" and "finite" scheduling?
Answer: the former set does not consider any adjustment to plans
because of planned capacity utilization


◉ what is the concept that relates to scheduling based on the needs of a
bottleneck? Answer: theory of constraints
1. determine bottleneck work centers
2. look for quick solutions to eliminate bottlenecks
3. concentrate scheduling efforts on managing bottleneck resources


◉ what are ways that capacity can be measured? Answer: labor hours,
machine hours, physical units, monetary units


◉ when capacity does not match the plan, which of the following
actions can be taken?
i. provide sufficient capacity
ii. change the material plan
iii. modify capacity calculations Answer: i. provide sufficient capacity
ii. change the material plan


◉ which of the following is an objective of capacity planning?

, i. building excess capacity for possible future use
ii. estimating capacity requirements early enough to take action if
necessary
iii. execution of the plan to avoid surprises Answer: ii. estimating
capacity requirements early enough to take action if necessary
iii. execution of the plan to avoid surprises


◉ which capacity planning activities are considered long range
planning? Answer: resource planning and rough-cut capacity planning


◉ which capacity planning activities are considered short-range
planning? Answer: finite scheduling and input/output analysis


◉ resource planning is most closely linked to which manufacturing
planning and control (MPC) element? Answer: sales and operations
planning (SOP)


◉ Capacity requirements planning (CRP) is most closely linked to
which manufacturing planning and control (MPC) element? Answer:
detailed material planning


◉ Which capacity planning technique is based on accounting and/or
historical data? Answer: capacity planning using overall factors

Información del documento

Subido en
11 de julio de 2026
Número de páginas
13
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Dayvon
1.0
(1)
Vendido
1
Seguidores
1
Artículos
1408
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes