ACI CONCRETE FIELD TESTING TECHNICIAN GRADE I EXAM Q&A |

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

Prepare for the ACI Concrete Field Testing Technician Grade I Exam with this comprehensive study guide featuring practice questions and detailed answers. Covers concrete sampling, slump testing, air content, temperature measurement, unit weight, molding and curing test specimens, ASTM testing procedures, quality control, field testing techniques, safety standards, and ACI certification requirements. Ideal for technicians, inspectors, contractors, and construction professionals preparing for ACI Grade I certification. Updated for the testing period.

Vista previa del contenido

ACI Concrete Field Testing Technician-
Grade I exam questions and answers

The sensor of the temperature measuring device shall be submerged a minimum of in.
[ mm] into the freshly mixed concrete. - answer 3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to +- degrees F [+- C] throughout a range of _______ answer 1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated , or whenever there is a question
of . - answer Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - answer
True



The temperature of concrete may be measured in a wall form. True of False - answer True



A composite sample of concrete is required even if the only purpose for obtaining the sample
is to determine temperature. True of False? - answer False



What must be done to the sample container prior to sampling the concrete? - answer
Dampen (with water)

,What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete. - answer Gently press the concrete around the
temperature measuring device at the surface of the concrete



How long must the temperature measuring device remain in the freshly mixed concrete? -
answer At least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - answer Reporting of
temperature



The temperature of concrete is reported to the nearest degrees F [ ____ C] - answer 1
degree F [0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - answer
Verify conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False?
- answer False



The sample of concrete used for temperature determination must be rodded 25 times. True
or False? - answer False



Sampling by this method is required when tests are to be made to determine with
specification requirements. - answer Compliance



This method covers sampling from four types of mixtures which are , , , and
. - answer Stationary mixers, paving mixers, revolving drum mixers, and open top
mixers

, The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - answer 15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the
sample. True of False? - answer True



The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is minutes. -
answer 5



The molding of strength test specimens shall begin within minutes after fabricating the
composite sample. - answer 15



The concrete sample must be protected from contamination and . - answer Rapid
evaporation



The minimum size sample for making strength test specimens is . - answer 28 L (1ft^3)



When sampling from a stationary mixer, the batch must be sampled at or more
regularly spaced intervals during discharge of the middle portion of the batch - answer 2



The composite sample for a paving mixer must represent a minimum of different
portions of the batch of concrete taken from the pile after discharge. - answer 5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum
of regularly spaced intervals during discharge of the middle portion of this batch. -
answer 2

Información del documento

Subido en
11 de julio de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
356
Última venta
-


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes