The owner must prove financial capability no later than ________ days
prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7
D.30 - ANSWER ✔✔Answer: C. 7 - AIA 701.6.2
How many copies of the plans and specifications shall the contractor
maintain on site? A. 1 B. 2 C. 3 D. 4 - ANSWER ✔✔Answer: A. 1 -
AIA201 2.3.6
,Contracts entered into by unlicensed contractors ________________. A.
are immoral B.are illegal C. are enforceable D. are unenforceable -
ANSWER ✔✔Answer: D. are unenforceable - CM 2-94 489.128
The subcontractor agrees that all work shall be done subject to the final
approval of the ______________________. A. architect B. contractor C.
both A & B are correct D. none of the above - ANSWER ✔✔Answer:
C. A & B are correct - AIA 401.4.2.5
Which of the following is NOT exempt from chapter 489? A. An
employee of a licensee who is subordinate of a construction licensee
acting within the scope. B. Owners of a property with a cost of $85,000.
C. Contractors in work on bridges and roads. D. Anybody doing work of
a minor nature - less $1,000 or less. - ANSWER ✔✔Answer B.
Owners of property $85,000 - CM 2-63 489.103 Limit is $75,000.
The architect has the sole responsibility for ordering
__________________. A. Change orders B. Construction change
directives C. any minor change of work D. any changes whatsoever -
ANSWER ✔✔Answer: C. any minor change in work - AIA 201 7.1.2
When considering the location of your office, which of the following is not
a consideration? A. Zoning Ordinances B. Demographic makeup of
, community C. Building Permits D. Flood Prone Area Maps -
ANSWER ✔✔Answer: B. Demographic Makeup - CM 1-15
The bonding cost for a class "B" contract of $900,000 will cost
________________. A. $9,000 B. $10,000 C. $12,500 D. $22,500 -
ANSWER ✔✔Answer: C. $12,500 CM 4-18 Graduated scale: 1st-
100x25%+ 2,500 2nd 400 x15%+ 6,000 3rd 400x 10%=4,000 Total
$12,500
A project is to be considered abandoned after _________ days if the
contractor just terminates the project without notification to the owner
and without cause. A. 30 B. 60 C. 45 D. 90 - ANSWER ✔✔Answer D.
90 - CM 2-96 , 489.129.1.j
If, at the end of a quarter, a contractor's total FUTA tax is $150, the
contractor _____________________. A. may add the tax to the amount
for deposit for the next quarter B. must deposit the tax during the 1st
month after the quarter. C. must deposit the tax during the 2nd month
after the quarter D. must deposit the tax during the 3rd month after the
quarter. - ANSWER ✔✔Answer: A. Add the tax for the next quarter -
CM 3-183