Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

ICA 2 REVIEWER UPDATED ACTUAL Questions and CORRECT Answers

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
09-07-2026
Escrito en
2025/2026

ICA 2 REVIEWER UPDATED ACTUAL Questions and CORRECT Answers

Institución
Stuvia
Grado
Stuvia

Vista previa del contenido

ICA 2 REVIEWER UPDATED ACTUAL Questions and CORRECT
Answers

Question: 1. Who can best interpret Architectural drawings? Architect Foreman Trade professional
Draftsman
Correct Answer: Architect
Question: Who should sign architectural drawings? Architect Consultant Draftsman Foreman
Correct Answer: Architect
Question: You were commissioned to do a Master Plan. What should you do first? Survey the location
Study existing laws Direct all department heads Coordinate with the local gov't
Correct Answer: Survey the location
Question: How often does the Architect-of-record visit the job site? As often as He/She wants Twice a
month Once a week Never
Correct Answer: As often as He/She wants
Question: Specifications should be clear and easy to understand. What must be avoided? Abbreviations
Quantitative description Superlative Adjectives Sentence with double meaning
Correct Answer: Sentence with double meaning
Question: A permit prior to the commencement of a project Building permit ECC Sidewalk permit
Excavation permit
Correct Answer: Building permit
Question: What are the qualifications of someone who wishes to take the licensure exam for architects? All
of the above Graduate of Architecture Submitted the necessary requirements to PRC Filipino citizen
Correct Answer: All of the above
Question: An outline specification enumerating the type trade names of materials to be used and finishes is
known as Estimates Bill of materials PERT-CPM Schedule of materials and finishes
Correct Answer: Schedule of materials and finishes
Question: Under BP 220, the maximum length of a block is 400 meters. However, Block lengths exceeding
250 meters should be provided with an alley approximately ay midlength. How wide is the alley? 2.00
meters 1.00 meters 1.50 meters 0.50 meters
Correct Answer: 2.00 meters
Question: Which of the following is not part of the RROW? Yard Carriageway Sidewalk Curb
Correct Answer: Yard
Question: Under BP 220. it shall have a width of 3.00 meters intended only to provide pedestrian access to
property for socialized housing projects. It shall have a maximum length of 60 meters Collector Pathwalk
Alley Sidewalk
Correct Answer: Pathwalk
Question: What is the minimum RROW access to an Interior lot? 5m 2m 4m 3m

, Correct Answer: 3m
Question: For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side shall be?
2.4m 0.90m 1.00m 1.2m
Correct Answer: 1.2m
Question: Minimum side setback for R-1 None of the above 2.5m 2m 3m
Correct Answer: 2m
Question: Using the 1977 National Building Code, what is the minimum setback for R-1 3.0m none of the
above 5.0m 4.0m
Correct Answer: 3.0m
Question: What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the
Second floor? 2.40m 1.80m 2.10m 2.70m
Correct Answer: 2.40m
Question: What is the minimum ceiling height at the ground floor for Habitable Rooms with Natural
Ventilation? 2.40m 1.80m 2.10m 2.70m
Correct Answer: 2.70m
Question: Height of ceiling at 5th floor with Natural Ventilation? 2.40m 1.80m 2.10m 2.70m
Correct Answer: 2.70m
Question: What is the minimum dimension of a Kitchen? 2.00 m x 3.00 m 1.50 m x 1.50 m 1.50 m x 2.00
m 2.00 m x 2.00 m
Correct Answer: 1.50 m x 2.00 m
Question: Which is NOT considered in a Master Development Plan? Site Development Urban Planning
Building Height none of the above
Correct Answer: Building Height
Question: What is meant by R3 in residential zone? General density housing Medium Density Housing
none of the above High Density Housing
Correct Answer: High Density Housing
Question: Specifications contain? Bill of materials Other conditions of services Responsibility of clients
Quality of materials
Correct Answer: Quality of materials
Question: What is the purpose of Bill of Materials? Construction Guide Reference on Cost Loan Bidding
Correct Answer: Reference on Cost
Question: Who is responsible for making/ producing Architectural Drawings? Architect Engineer
Draftsman Office Staff
Correct Answer: Architect
Question: What is not a Structural Plan? Foundation Plan Floor Framing Plan Roof framing plan Schedule
of Beams

Escuela, estudio y materia

Institución
Stuvia
Grado
Stuvia

Información del documento

Subido en
9 de julio de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1459
Miembro desde
2 año
Número de seguidores
105
Documentos
97742
Última venta
1 día hace
MGRADES

Welcome to MGRADES ,Based at Stanford University in California. I guarantee success and you may end up coming back again and again. We do this for you . We offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

237 reseñas

5
97
4
51
3
54
2
15
1
20

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes