CM 1070 COMPREHENSIVE EXAM QUESTIONS AND
ANSWERS SURE A+
✔✔Which of the following is NOT a rapidly renewable material?
Select one:
A. Gravel
B. Bamboo
C. Wool
D. Linoleum - ✔✔A
✔✔The highest demand for energy in the built environment is typically during
_________. - ✔✔Mid-afternoon in the hottest part of summer
✔✔Which of the following is not an energy efficiency method used in the Trees Atlanta
building?
Select one:
A. task lighting
B. bioswales
C. glazing
D. daylighting - ✔✔B
✔✔Which one of the following is an option for terminating the lifecycle of a facility?
A. Deconstruction
B. All of these options
C. Disposal
D. Demolition - ✔✔B
✔✔*_______________________* is one of the processes for a built facility to improve
its performance in the end-of-life cycle phase. - ✔✔Rehabilitation
, ✔✔When energy demand exceeds supply, the system becomes so unstable that safety
mechanisms activated to take part of the grid offline. This is known as a
___________________. - ✔✔Blackout
✔✔Choosing a ____________ site for a building might offer a tax credit or development
incentive for the developer. - ✔✔Brownfield
✔✔Based on the people's place library in Canada, __________ system is used to
remove oils and sediment from water before it enters local waterways.
A. Rainwater Harvesting
B. Hydration Station
C. All of these items
D. Stormceptor catchment - ✔✔D
✔✔Which phase in the lifecycle of a built facility has the greatest opportunity to
influence the environmental impacts? - ✔✔Pre-Design
✔✔Which one of the following is NOT true about Bioswales?
A. It helps to remove contaminants from runoff
B. It is often used in conjunction with alternative pavement
C. It is a vegetated area to absorb stormwater runoff
D. It allows stormwater to infiltrate the site - ✔✔D
✔✔The Trees Atlanta project team faced which concern when considering energy
efficiency? - ✔✔Cost
✔✔Which of the following is NOT a resulting document from the Design Phase?
Select one:
A. Schematic design
B. Performance Criteria
C. Conceptual design
D. Construction documents - ✔✔B
✔✔Trees have positive effects on the following EXCEPT:
Select one:
A. property value
B. water quality
C. air quality
D. water retention - ✔✔B
✔✔Which of the following is not a sustainability-related track in integrative design
steps?
A. Material analysis
B. Resource analysis & modeling
ANSWERS SURE A+
✔✔Which of the following is NOT a rapidly renewable material?
Select one:
A. Gravel
B. Bamboo
C. Wool
D. Linoleum - ✔✔A
✔✔The highest demand for energy in the built environment is typically during
_________. - ✔✔Mid-afternoon in the hottest part of summer
✔✔Which of the following is not an energy efficiency method used in the Trees Atlanta
building?
Select one:
A. task lighting
B. bioswales
C. glazing
D. daylighting - ✔✔B
✔✔Which one of the following is an option for terminating the lifecycle of a facility?
A. Deconstruction
B. All of these options
C. Disposal
D. Demolition - ✔✔B
✔✔*_______________________* is one of the processes for a built facility to improve
its performance in the end-of-life cycle phase. - ✔✔Rehabilitation
, ✔✔When energy demand exceeds supply, the system becomes so unstable that safety
mechanisms activated to take part of the grid offline. This is known as a
___________________. - ✔✔Blackout
✔✔Choosing a ____________ site for a building might offer a tax credit or development
incentive for the developer. - ✔✔Brownfield
✔✔Based on the people's place library in Canada, __________ system is used to
remove oils and sediment from water before it enters local waterways.
A. Rainwater Harvesting
B. Hydration Station
C. All of these items
D. Stormceptor catchment - ✔✔D
✔✔Which phase in the lifecycle of a built facility has the greatest opportunity to
influence the environmental impacts? - ✔✔Pre-Design
✔✔Which one of the following is NOT true about Bioswales?
A. It helps to remove contaminants from runoff
B. It is often used in conjunction with alternative pavement
C. It is a vegetated area to absorb stormwater runoff
D. It allows stormwater to infiltrate the site - ✔✔D
✔✔The Trees Atlanta project team faced which concern when considering energy
efficiency? - ✔✔Cost
✔✔Which of the following is NOT a resulting document from the Design Phase?
Select one:
A. Schematic design
B. Performance Criteria
C. Conceptual design
D. Construction documents - ✔✔B
✔✔Trees have positive effects on the following EXCEPT:
Select one:
A. property value
B. water quality
C. air quality
D. water retention - ✔✔B
✔✔Which of the following is not a sustainability-related track in integrative design
steps?
A. Material analysis
B. Resource analysis & modeling