A-Series AIA Contract Documents


Give this one a try later!


Al0l: Standard Form of Agreement Between Owner and Contractor-
Stipulated Sum

A133: Owner-Construction Manager as Constructor Agreement

A195: Owner-Contractor Agreement for Integrated Project Delivery


A201: General Conditions of the Contract for Construction

A295: General Conditions of the Contract for Integrated Project Delivery

A70l: Instructions to Bidders




Program Management (PgM)

,Give this one a try later!


The science and practice of managing large private and public projects.




Assessing the Needs of the Project


Give this one a try later!


Selecting the right delivery method.
Align contract requirements to the project.
Align your own services with the needs of the project.
Identify other parties in the project - based on delivery method (design
build vs design bid build).
Design bid build most prevalent, Const Mgt is second most prevalent.




Uses of AIA Contract Documents (3)


Give this one a try later!


Negotiate the Terms of Your Relationship
Deliver Elements of Agreements
Manage Risks




BIM


Give this one a try later!

, Building Information Modeling




Exhibit-1 to the B101


Give this one a try later!


An initial information exhibit. Used as a checklist. Forms the basis of
Architects / parties understanding of the agreement.

This contract is a standard agreement between the owner and architect. It
outlines the responsibilities for each party in order to help mitigate risk.




What types of Charattes are QM actions in Schematic Design?


Give this one a try later!


Kickoff Charattes, Sustainability Charettes, and Remedial Charettes.




The following is included in an Architect's minimum construction contract
administration services.


Give this one a try later!

, Reporting to the building official
Approving submittals
Reporting to the owner
Shop drawing review
Periodic site visits




Q. A team is assembled to convert a space into a very small veterinary office. The
project is not complex, and the architects estimated that the project fee will be
approximately $30,000. The project requires coordination among the few team
members. Which is the best way to coordinate and manage the project? Select the
best answer.


Give this one a try later!


A. Milestone chart
B. CPM schedule
C. Gantt Chart
D. Bar Chart

Solution: The correct answer is A.
The milestone chart is used for short-duration projects with relatively few
tasks to track and fees under $35,000. It is tempting to use this method for
larger projects, but this would simply not provide the detail needed to
manage the project. A CMP schedule could be another alternative, but in
the case of such a small scope, it is not necessary. The Gantt Chart is the
same as the bar chart.
Reference: Wiley and Sons. (2013). The architect's handbook of professional
practice (15th ed.).




Consequential Damages


Give this one a try later!

Información del documento

Subido en
7 de julio de 2026
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
scholarmotivator
4.1
(16)
Vendido
148
Seguidores
48
Artículos
6079
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes