QUESTIONS AND VERIFIED ANSWERS
◉EPA gives the State _______ days then they take action.. Answer: 30
◉Arrival introduction. Answer: -Credentials and ID (who you are)
-Purpose of visit (why are you there)
-What to expect at the end of the visit
-What they may receive and when follow up will occur
◉Pre construction meetings. Answer: 1. Clarify objectives
2. Designate a contact person for communicating concerns
3. Determine if the sequence and plan will work, if not revise.
4. Make sure everyone reviews the plan/SWPPP
5. Remind everyone that BMPs are performance based and could
require changes, and establish procedure for those changes
6 Hold your conference on site. Let them see the big picture
7. Verify schedules
8. Discuss maintenance requirements
9. Discuss containment, storage, and spill procedures.
, 10. Establish open commutation with all responsible individuals
◉If it isn't written down.. Answer: It didn't happen.
◉The only proof of site conditions is. Answer: Pictures and written
records
◉Note taking. Answer: Defendable and objective. NOT inflammatory
or subjective.
◉(Note taking) Initial and date all. Answer: Revisions and changes
◉(Note taking) Be specific, do not. Answer: Generalize
◉Do not make statements that cannot be. Answer: Defended in
court.
◉Remember to report without giving a. Answer: Solution
Proposing a solution could place you in a liability situation
◉Follow through with all ___________ even if invalid or beyond your
control.. Answer: Complaints