SCMN 4770 Exam 3 Questions With
Correct Answers
When capacity does not match the plan, which of the following actions
| | | | | | | | | | | |
can be taken? - CORRECT ANSWER✔✔-1. Provide sufficient capacity
| | | | | | | |
2. Change the material plan
| | | |
Which of the following is an objective of capacity planning? - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1. Building excess capacity for possible future use| | | | | | |
3. Execution of the plan to avoid surprises
| | | | | | |
Which capacity planning activities are considered long-range planning? -
| | | | | | | |
CORRECT ANSWER✔✔-a. resource planning and rough-cut capacity
| | | | | | | |
planning
Which capacity planning activities are considered short-range planning?
| | | | | | |
- CORRECT ANSWER✔✔-d. finite scheduling and input/output analysis
| | | | | | | |
Resource planning is most closely linked to which manufacturing
| | | | | | | | |
planning and control (MPC) element? - CORRECT ANSWER✔✔-b. Sales
| | | | | | | | |
and operations planning (SOP)
| | |
,Capacity requirements planning (CRP) is most closely linked to which
| | | | | | | | | |
manufacturing planning and control (MPC) element? - CORRECT
| | | | | | | |
ANSWER✔✔-c. detailed material planning | | |
Which capacity planning technique is based on accounting and/or
| | | | | | | | |
historical data? - CORRECT ANSWER✔✔-a. capacity planning using
| | | | | | | |
overall factors (CPOF)
| |
What is the total required capacity (in standard hours) for period 2?
| | | | | | | | | | | |
(Choose the best answer) - CORRECT ANSWER✔✔-b. 110
| | | | | | |
What is the required capacity in work center 100 for period 6? (Choose
| | | | | | | | | | | | |
the best answer) - CORRECT ANSWER✔✔-d. 130
| | | | | |
What is the total required capacity in work center 200 over the 13-
| | | | | | | | | | | |
period planning horizon? (Choose the best answer) - CORRECT
| | | | | | | | |
ANSWER✔✔-250
T/F: The capacity planning using overall factors (CPOF) planning method
| | | | | | | | | |
is likely to function poorly in a just-in-time (JIT) environment - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-False
, T/F: The capacity bill planning technique provides more direct linkages
| | | | | | | | | |
to end products than does the capacity planning using overall factors
| | | | | | | | | | |
(CPOF) planning method - CORRECT ANSWER✔✔-True
| | | | |
Under what conditions are both capacity planning using overall factors
| | | | | | | | | |
(CPOF) and capacity bills likely to return the same capacity requirements
| | | | | | | | | |
results? - CORRECT ANSWER✔✔-c. when planning for a single product
| | | | | | | | | | |
that is produced in a single work center
| | | | | | |
What is the required capacity in work center 100 for period 6? -
| | | | | | | | | | | | |
CORRECT ANSWER✔✔-c. 45 | |
What is the total required capacity in work center 200 over the 13-
| | | | | | | | | | | |
period planning horizon? - CORRECT ANSWER✔✔-775
| | | | |
Resource profile planning differs from capacity planning using overall
| | | | | | | | |
factors (CPOF) and capacity bills by considering which of the following? -
| | | | | | | | | | |
|CORRECT ANSWER✔✔-b. projected workload in individual work centers
| | | | | | |
In which of the following ways does capacity requirements planning
| | | | | | | | | |
(CRP) differ from rough-cut capacity planning techniques? - CORRECT
| | | | | | | | |
ANSWER✔✔-1. CRP uses a time-phased approach | | | | |
2. CRP considers service part demand
| | | | |
Correct Answers
When capacity does not match the plan, which of the following actions
| | | | | | | | | | | |
can be taken? - CORRECT ANSWER✔✔-1. Provide sufficient capacity
| | | | | | | |
2. Change the material plan
| | | |
Which of the following is an objective of capacity planning? - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1. Building excess capacity for possible future use| | | | | | |
3. Execution of the plan to avoid surprises
| | | | | | |
Which capacity planning activities are considered long-range planning? -
| | | | | | | |
CORRECT ANSWER✔✔-a. resource planning and rough-cut capacity
| | | | | | | |
planning
Which capacity planning activities are considered short-range planning?
| | | | | | |
- CORRECT ANSWER✔✔-d. finite scheduling and input/output analysis
| | | | | | | |
Resource planning is most closely linked to which manufacturing
| | | | | | | | |
planning and control (MPC) element? - CORRECT ANSWER✔✔-b. Sales
| | | | | | | | |
and operations planning (SOP)
| | |
,Capacity requirements planning (CRP) is most closely linked to which
| | | | | | | | | |
manufacturing planning and control (MPC) element? - CORRECT
| | | | | | | |
ANSWER✔✔-c. detailed material planning | | |
Which capacity planning technique is based on accounting and/or
| | | | | | | | |
historical data? - CORRECT ANSWER✔✔-a. capacity planning using
| | | | | | | |
overall factors (CPOF)
| |
What is the total required capacity (in standard hours) for period 2?
| | | | | | | | | | | |
(Choose the best answer) - CORRECT ANSWER✔✔-b. 110
| | | | | | |
What is the required capacity in work center 100 for period 6? (Choose
| | | | | | | | | | | | |
the best answer) - CORRECT ANSWER✔✔-d. 130
| | | | | |
What is the total required capacity in work center 200 over the 13-
| | | | | | | | | | | |
period planning horizon? (Choose the best answer) - CORRECT
| | | | | | | | |
ANSWER✔✔-250
T/F: The capacity planning using overall factors (CPOF) planning method
| | | | | | | | | |
is likely to function poorly in a just-in-time (JIT) environment - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-False
, T/F: The capacity bill planning technique provides more direct linkages
| | | | | | | | | |
to end products than does the capacity planning using overall factors
| | | | | | | | | | |
(CPOF) planning method - CORRECT ANSWER✔✔-True
| | | | |
Under what conditions are both capacity planning using overall factors
| | | | | | | | | |
(CPOF) and capacity bills likely to return the same capacity requirements
| | | | | | | | | |
results? - CORRECT ANSWER✔✔-c. when planning for a single product
| | | | | | | | | | |
that is produced in a single work center
| | | | | | |
What is the required capacity in work center 100 for period 6? -
| | | | | | | | | | | | |
CORRECT ANSWER✔✔-c. 45 | |
What is the total required capacity in work center 200 over the 13-
| | | | | | | | | | | |
period planning horizon? - CORRECT ANSWER✔✔-775
| | | | |
Resource profile planning differs from capacity planning using overall
| | | | | | | | |
factors (CPOF) and capacity bills by considering which of the following? -
| | | | | | | | | | |
|CORRECT ANSWER✔✔-b. projected workload in individual work centers
| | | | | | |
In which of the following ways does capacity requirements planning
| | | | | | | | | |
(CRP) differ from rough-cut capacity planning techniques? - CORRECT
| | | | | | | | |
ANSWER✔✔-1. CRP uses a time-phased approach | | | | |
2. CRP considers service part demand
| | | | |