SCMN 4770 Exam 2 Text Book Questions
With Correct Answers

Which of the following are prerequisites to implementing a master
| | | | | | | | | |



production-scheduling system? |




I. Define master production schedule (MPS) unit
| | | | | |




II. Install an enterprise resource planning (ERP) system
| | | | | | | |




III. Train an employee in MPS concepts and techniques - CORRECT
| | | | | | | | | | |



ANSWER✔✔-Define master production schedule (MPS) unit and train
| | | | | | | |



an employee in MPS concepts and techniques
| | | | | |




The master production schedule (MPS) translates the sales and
| | | | | | | | |



operations plan (SOP) into... - CORRECT ANSWER✔✔-A specialized
| | | | | | | |



production plan |




The master production schedule (MPS) shows when products will
| | | | | | | | |



physically be available to ship (T/F) - CORRECT ANSWER✔✔-False
| | | | | | | |




The master production schedule (MPS) is... - CORRECT ANSWER✔✔-
| | | | | | | |



Neither a statement of current production nor current demand
| | | | | | | |

,The master production schedule (MPS) differs from the forecast by
| | | | | | | | | |



considering...
I. Capacity limits
| | |




II. Production costs
| |




III. The sales and operations plan (SOP) - CORRECT ANSWER✔✔-
| | | | | | | | |



Capacity limits, production costs, the sales and operations plan (SOP)
| | | | | | | | |




The master production schedule (MPS) must be stated in terms that
| | | | | | | | | | |



relate to a producible product (T/F) - CORRECT ANSWER✔✔-True
| | | | | | | |




The master production schedule (MPS) must be stated in terms of actual
| | | | | | | | | | |



products (T/F) - CORRECT ANSWER✔✔-False
| | | | |




In which environment is planning bill of materials most likely to be
| | | | | | | | | | | |



used? - CORRECT ANSWER✔✔-Assemble-to-order
| | |




The master production (MPS) considers preferred lot sizes when
| | | | | | | | |



constructing the plan (T/F) - CORRECT ANSWER✔✔-True | | | | | |




Cycle stock is... - CORRECT ANSWER✔✔-Inventory carried as a result of
| | | | | | | | | | |



lot size requirements
| |

, Available-to-promise (ATP) is likely to be least useful in which | | | | | | | | | |



environment? - CORRECT ANSWER✔✔-Make-to-Stock | | |




Which formula is used to calculate the projected available inventory
| | | | | | | | | |



balance? - CORRECT ANSWER✔✔-Projected available inventory =
| | | | | | |



Previous available inventory + Master production schedule - MAX
| | | | | | | | |



(forecast, actual orders) | |




A planning bill of materials is... - CORRECT ANSWER✔✔-Any bill of
| | | | | | | | | | |



materials used in planning activities | | | |




In an assemble-to-order environment, a planning bill must use at least
| | | | | | | | | | |



one of each component that could go on a completed product (T/F) -
| | | | | | | | | | | | |



CORRECT ANSWER✔✔-True |




The final assembly schedule (FAS) represents which of the following?
| | | | | | | | |




I.The assembly plan when a planning bill of fire is used
| | | | | | | | | |




II. The exact set of end products to be built in an assemble-to-order
| | | | | | | | | | | | |



environment |




III. The plan for moving pre-fabricated components into completed
| | | | | | | | |



products - CORRECT ANSWER✔✔-The assembly plan when a planning
| | | | | | | | |



bill of fire is used, the exact set of end products to be built in an
| | | | | | | | | | | | | | | |



assemble-to-order environment, the plan for moving pre-fabricated | | | | | | |



components into completed products | | |

Información del documento

Subido en
3 de julio de 2026
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip
4.0
(42)
Vendido
271
Seguidores
6
Artículos
25655
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes