LP GAS ACTUAL CERTIFICATION PAPER
2026 QUESTIONS WITH ANSWERS FULL
SOLUTION.
■ Bulk plant emergency shutoff for 4001 gal aggregate wc or more shall
have. Answer- opening of 1 1/4 in or more
pneumatically operated ESV
pneumatically operated internal valves
back-check valves for into tank only
■ Thermal element must be located within ____ ft of the ESV and can
NOT BE _____. Answer- 5
painted
■ All underground pipe, metallic or poly must be covered by ____
inches or ____ inches if damage is likely. Answer- 12
18
■ Outdoor metallic piping shall have ___ pressure limits. Answer- no
■ Polyethylene piping systems shall be limited to ____ psig. Answer- 30
,■ Polyethylene piping shall be used _______ only. Answer- underground
■ Texas school leak tests must last a minimum of ____ minutes. Answer-
30
■ LPG form ____ must be keep on file for ____ years. Answer- 30
5
■ Texas school leak tests must be done every ____ years. Answer- 2
■ The term NQT on cargo tanks means. Answer- Non-Quenched
Tempered
■ Single family home pressure testing must last a minimum of ___
minutes. Answer- 10
■ Pressure testing and inspection should be no less than ____ hour for
every ____ feet. Answer- 1/2
500
■ cylinders with ____ lbs propane through ____ lbs propane capacity for
vapor service shall have overfilling prevention device and a fixed liquid
level gauge. Answer- 4.2
, 40
■ cylinders with 4.2 lbs propane through 40 lbs propane capacity for
vapor service shall have ____ ____ ____ and a ____ ____ ____ _____.
Answer- overfilling prevention device
fixed liquid level gauge
■ cylinders are designed with atleast ____ psig service pressure.
Answer- 240
■ LP-Incident/accidents
notify ____ by telephone within ____ hours following discovery.
Answer- AFS
2
■ methods for conducting leak test on schools
____ of 1st stage regulator
____ the 1st stage & 2nd stage regulator
____ of the final stage regulator. Answer- upstream
between
downstream
2026 QUESTIONS WITH ANSWERS FULL
SOLUTION.
■ Bulk plant emergency shutoff for 4001 gal aggregate wc or more shall
have. Answer- opening of 1 1/4 in or more
pneumatically operated ESV
pneumatically operated internal valves
back-check valves for into tank only
■ Thermal element must be located within ____ ft of the ESV and can
NOT BE _____. Answer- 5
painted
■ All underground pipe, metallic or poly must be covered by ____
inches or ____ inches if damage is likely. Answer- 12
18
■ Outdoor metallic piping shall have ___ pressure limits. Answer- no
■ Polyethylene piping systems shall be limited to ____ psig. Answer- 30
,■ Polyethylene piping shall be used _______ only. Answer- underground
■ Texas school leak tests must last a minimum of ____ minutes. Answer-
30
■ LPG form ____ must be keep on file for ____ years. Answer- 30
5
■ Texas school leak tests must be done every ____ years. Answer- 2
■ The term NQT on cargo tanks means. Answer- Non-Quenched
Tempered
■ Single family home pressure testing must last a minimum of ___
minutes. Answer- 10
■ Pressure testing and inspection should be no less than ____ hour for
every ____ feet. Answer- 1/2
500
■ cylinders with ____ lbs propane through ____ lbs propane capacity for
vapor service shall have overfilling prevention device and a fixed liquid
level gauge. Answer- 4.2
, 40
■ cylinders with 4.2 lbs propane through 40 lbs propane capacity for
vapor service shall have ____ ____ ____ and a ____ ____ ____ _____.
Answer- overfilling prevention device
fixed liquid level gauge
■ cylinders are designed with atleast ____ psig service pressure.
Answer- 240
■ LP-Incident/accidents
notify ____ by telephone within ____ hours following discovery.
Answer- AFS
2
■ methods for conducting leak test on schools
____ of 1st stage regulator
____ the 1st stage & 2nd stage regulator
____ of the final stage regulator. Answer- upstream
between
downstream