DISPENSING INSTALLATION &
MAINTENANCE
The-point-of-transfer-at-a-dispensing-unit-must-be-____-from-Public-ways,-including-public-
streets,-highways,-thoroughfares,-and-sidewalks.
A.-10-feet
B.-15-feet
C.-25-feet---ans-✔✔A.-10-feet
Steel-supports-on-vertical-ASME-containers-shall-be-protected-against-fire-exposure-with-
a-material-having-a-fire-resistance-rating-of-a-least-_____,-except-that-continuous-steel-
skirts-that-have-only-one-opening-that-is-18-in.-or-less-in-diameter-shall-have-fire-
protection-applied-to-the-______-of-the-skirts.
A.-3-hrs;-outside
B.-2-hrs;-outside
C.-3-hrs;-inside---ans-✔✔B.-2-hrs;-outside
Pressure-relief-devices-installed-in-underground-containers-serving-dispensing-systems-
shall-be-piped-vertically-upward-to-a-point-at-least-_____-above-the-ground.
A.-2-feet
B.-6-feet
C.-10-feet---ans-✔✔C.-10-feet
A-remote-emergency-shut-off-device-for-either-the-internal-valve-or-emergency-shutoff-
valve-is-required-to-be-located-not-less-than-_____-or-more-than-_____-from-the-liquid-
transfer-point.
A.-10-ft-;-50ft
B.-10-ft;-100ft
C.-3-ft;-100ft---ans-✔✔C.-3-ft;-100ft
The-markings-for-the-switch-or-circuit-breaker-to-shut-off-power-in-an-emergency-shall-be-
visible-from-________.