NJ Boilers Test || All Answers are Valid.
Should an incident occur in the boiler room, you must immediately contact the Chief Inspector in
Trenton. correct answers True
Where on the Certificate of Inspection would you find the State of New Jersey jurisdiction
number? correct answers Upper left corner
What ASME codes are heating boilers built to? correct answers Section IV
In accordance with N.J.A.C. 12:90 rules, low pressure boiler plants are not required to have a
chief engineer. correct answers True
According to state boiler regulations, where should the boiler registration number be located?
correct answers on the front of the boiler
What is the maximum temperature allowed on all low pressure heating boilers? correct answers
250 degrees F
A boiler inspector has the right to inspect the boiler without notice. correct answers True
What is the maximum penalty for performing the duties of a boiler operator with an expired
license? correct answers $5,000
What is the official ASME letter stamp used to denote low pressure heating boilers? correct
answers H
What are the four systems required to operate a steam boiler? correct answers steam, feedwater,
fuel, and draft
, If in good standing, an expired license can be renewed within a period of: correct answers 3
years
There is no need for a duplicate license when you work at two locations because you can post a
photocopy of your original one. correct answers False
By N.J.A.C. rules, a school with a boiler plant with a total interconnected capacity of 100 BHP
would require a properly licensed operator to be present whenever the building was deemed
occupied. correct answers False
The minimum penalty for cheating on the boiler exam is $600. correct answers False
The maximum setting allowed on a low pressure steam boiler safety valve is 15 psi. correct
answers True
What is the minimum penalty for not properly posting your license? correct answers $500
To obtain a Low Pressure Black Seal license, you must have 90 days documented training on
equipment that has an aggregate capacity of 4,000 lbs/hr. correct answers True
What is the maximum temperature and pressure a hot water supply boiler can have to be
considered a low pressure boiler? correct answers 160 psi at 250 degrees F
A boiler operator's log shall be maintained in each plant containing over: correct answers 100
Boiler HP
Logbooks must be hardbound and have consecutively numbered pages. correct answers True
By definition, a boiler is an open vessel in which water is turned to steam under pressure by the
application of heat. correct answers False
Should an incident occur in the boiler room, you must immediately contact the Chief Inspector in
Trenton. correct answers True
Where on the Certificate of Inspection would you find the State of New Jersey jurisdiction
number? correct answers Upper left corner
What ASME codes are heating boilers built to? correct answers Section IV
In accordance with N.J.A.C. 12:90 rules, low pressure boiler plants are not required to have a
chief engineer. correct answers True
According to state boiler regulations, where should the boiler registration number be located?
correct answers on the front of the boiler
What is the maximum temperature allowed on all low pressure heating boilers? correct answers
250 degrees F
A boiler inspector has the right to inspect the boiler without notice. correct answers True
What is the maximum penalty for performing the duties of a boiler operator with an expired
license? correct answers $5,000
What is the official ASME letter stamp used to denote low pressure heating boilers? correct
answers H
What are the four systems required to operate a steam boiler? correct answers steam, feedwater,
fuel, and draft
, If in good standing, an expired license can be renewed within a period of: correct answers 3
years
There is no need for a duplicate license when you work at two locations because you can post a
photocopy of your original one. correct answers False
By N.J.A.C. rules, a school with a boiler plant with a total interconnected capacity of 100 BHP
would require a properly licensed operator to be present whenever the building was deemed
occupied. correct answers False
The minimum penalty for cheating on the boiler exam is $600. correct answers False
The maximum setting allowed on a low pressure steam boiler safety valve is 15 psi. correct
answers True
What is the minimum penalty for not properly posting your license? correct answers $500
To obtain a Low Pressure Black Seal license, you must have 90 days documented training on
equipment that has an aggregate capacity of 4,000 lbs/hr. correct answers True
What is the maximum temperature and pressure a hot water supply boiler can have to be
considered a low pressure boiler? correct answers 160 psi at 250 degrees F
A boiler operator's log shall be maintained in each plant containing over: correct answers 100
Boiler HP
Logbooks must be hardbound and have consecutively numbered pages. correct answers True
By definition, a boiler is an open vessel in which water is turned to steam under pressure by the
application of heat. correct answers False