1. A construction estimator is reviewing bid documents and notices
discrepancies between architectural and structural drawings. What is the
most appropriate action?
A. Ignore discrepancies and proceed with estimate
B. Assume architectural drawings govern
C. Submit a Request for Information (RFI)
D. Estimate based on past projects
✔ Correct Answer: C. Submit a Request for Information (RFI)
Explanation: Submitting an RFI ensures clarification of discrepancies before
pricing, reducing risk of errors and claims.
2. Which cost estimating method is most appropriate during the conceptual
design phase?
A. Detailed quantity takeoff
B. Parametric estimating
C. Unit price estimating
D. Assembly estimating
✔ Correct Answer: B. Parametric estimating
, Explanation: Parametric estimating uses historical data and relationships,
making it ideal for early-stage estimates with limited detail.
3. What is the primary purpose of a contingency in an estimate?
A. Increase profit margin
B. Cover unknown risks and uncertainties
C. Offset labor inefficiencies
D. Reduce project duration
✔ Correct Answer: B. Cover unknown risks and uncertainties
Explanation: Contingency accounts for unforeseen conditions or
uncertainties not fully defined in project scope.
4. In a unit price contract, the final cost is determined by:
A. Lump sum agreement
B. Fixed overhead rate
C. Actual quantities installed
D. Contractor’s discretion
✔ Correct Answer: C. Actual quantities installed
Explanation: Payment is based on measured quantities multiplied by agreed
unit prices.
5. Which document outlines the scope of work in detail for estimation
purposes?
A. Bid form
B. Specifications
C. Change order
D. Purchase order
✔ Correct Answer: B. Specifications
Explanation: Specifications provide detailed descriptions of materials,
workmanship, and standards.
6. A project estimator includes escalation in cost estimates to account for:
A. Labor productivity
B. Inflation over time
, C. Equipment breakdown
D. Design changes
✔ Correct Answer: B. Inflation over time
Explanation: Escalation adjusts costs to reflect expected increases due to
inflation.
7. Which of the following is considered a direct cost?
A. Office rent
B. Project manager salary (corporate)
C. Concrete materials
D. Marketing expenses
✔ Correct Answer: C. Concrete materials
Explanation: Direct costs are directly attributable to construction activities.
8. What is the main purpose of a quantity takeoff?
A. Determine project duration
B. Identify labor productivity
C. Measure materials and quantities
D. Calculate profit margin
✔ Correct Answer: C. Measure materials and quantities
Explanation: Quantity takeoffs quantify materials required for accurate
pricing.
9. Indirect costs are also known as:
A. Variable costs
B. Overhead costs
C. Direct labor
D. Fixed costs
✔ Correct Answer: B. Overhead costs
Explanation: Indirect costs support the project but are not tied to specific
tasks.
10.Which factor most affects labor productivity?
A. Material color