Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 10 páginas
Examen

PMT EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Document preview thumbnail
Vista previa 2 fuera de 10 páginas

PMT EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 you are the new team lead for an existing team with job satisfaction issues. Using an outside party you collect a list of specific issues that employees say make the job dissatisfying such as a lack of recognition. You then create a matrix to plan how to increase satisfaction, such as arrange for high ranking officials - Answers A) Herbert two factor theory A software costing method that uses a team of experts working both independently and together to combine different approaches and arrive at a collective judgment through consensus is an example of which costing method? A) Parametric B) Bottom up C) Delphi D) Top down - Answers C) Delphi which of these is not a benefit of a federally funded research and development centers (FFRDC)? A) functions as an independent trusted advisor and honest broker B) responsible only to the government customer C) has a vested interest in certian technologies or solutions D) has no profit motive or conflict of interest - Answers C) has a vested interest in certain technologies or solutions which of the following is false? A) exit criteria must be successfully demonstrated before a program can proceed further B) exit criteria are not specific to a particular phase of an acquisition program C) exit criteria help manage and reduce risks D) exit criteria are measurable and demonstratable - Answers B) exit criteria are not specific to a particular phase of an acquisition program. exits are specific for programs and entrance are generic, the same for all programs which of the following is a way the govt communicates requirements to a vendor during a source selection? A) request for information B) statement of work C) industry day D) Contract debriefing - Answers B) statement of work What type of contract provides for payment to the contractor of a negotiated fee that is fixed at the inception of the contract? A) contract fixed price award fee B) contract firm fixed price C) cost plus incentive fee CPIF D) cost plus fixed fee CPFF - Answers D) cost plus fixed fee You are leading an Integrated Product Team (IPT) with members in 4 different locations. You are putting together a half-day meeting to update them on the current status of the program and prepare for the next phase. For the last meeting, you flew in 7 team members. This time, you are more open to other options, so you solicit opinions from the team, via a poll, to determine which approach is most popular with the team. Which decision-making method would be the best fit? A) Majority Vote B) Consensus C) Authoritative Unilateral D) Negotiated - Answers B) Consensus Your team is tasked to identify the causes of a major failure in a weapons system. Having gone through a similar task before using the same tools, you apply what was learned to improve your process this time. This represents which phase of the Experiential Learning Cycle? Testing in New Situations Observation and Reflections Forming Abstract Concepts Concrete Experience - Answers A testing in new situations You are a new team lead for an existing team with job satisfaction issues. Using an outside party, you collect a list of specific issues that employees say make the job dissatisfying, such as a lack of recognition. You then create a matrix to plan how to increase satisfaction. You are operating based on the principles of which theory of motivation? Herzberg Two-factor Theory Theory X Expectancy Theory Theory Y - Answers A Herzberg 2 factor theory Which of the following is a potential logistics support issue that tends to be associated with the acquisition of commercial and non-developmental items (NDI)? Availability of replacement parts Tradeoff between logistics reliability and system reliability Human systems integration factors Design producibility - Answers availability of replacement parts Which is NOT TRUE about Systems Engineering? It ensures the lowest possible production cost and shortest program schedule. It is iteratively applied throughout a system's development. It is fundamentally a problem solving process. It addresses issues like supportability and interoperability using the Integrated Product and Process Development (IPPD) process. - Answers It ensures the lowest possible production cost and shortest program schedule. The ___________ companies often centralize staff functions to support all business units; __________ companies often decentralize staff functions, dedicating them to each business or product organization. Check Mark Smaller/larger Larger/smaller Divisional/matrix Divisional/functional - Answers Smaller/Larger Who is responsible for formally representing the Government during Fact-Finding? Contracting Officer Program Manager Source Selection Authority Source Selection Evaluation Board - Answers Contracting officer The Navy gets some negative past performance information from the Marine Corps about a defense contractor who was late in delivering items on a contract last year. This contractor's proposal was one of five received in response to the Navy's Request for Proposal (RFP). Once the competitive range is established next week, the Contracting Officer plans on holding discussions with five offerors in the competitive range, to include the one with past negative performance. What form of information exchange would the Navy use to find out more about the contractor's late deliveries? Communications Clarifications Negotiations Solicitations - Answers communications Each of the following issues impact test planning and execution activities except one. Select the one that is NOT a test planning/execution issue. Having sufficient resources and test articles Interoperability testing requirements Determining funding required for test activities Determining Live Fire Testing requirements - Answers having sufficient resources and test articles The _______ refers to the cost of procuring prime mission equipment. Flyaway Cost Development Cost Life Cycle Cost Weapon System Cost - Answers Flyaway costs Which of the following organizations provides centralized management of DoD CI activities? Director, Defense Intelligence Agency (DIA) Under Secretary of Defense for Intelligence (OUSD (I)) Director, National Security Agency/Chief, Central Security Service (DIRNSA/CHCSS) Director, Defense Threat Reduction Agency (DTRA) - Answers Director DIA What is the primary life cycle sustainment objective of the Engineering and Manufacturing Development (EMD) phase? Developing the requirements for the long-term performance-based support concepts Identify potential support providers Refine the performance-based support concept and strategy Deploy the initial sustainment capabilities and demonstrate the effectiveness - Answers Developing the requirements for the long-term performance-based support concepts Which type of contract can be described as having a higher cost to the government than the contractor, may have requirements that are not well defined, and payments are made as costs are incurred? Cost reimbursement contracts Fixed-Price contracts Indefinite Delivery Contracts Time-and-Materials contracts - Answers cost reimbursement Which type of budgeting review takes place during the execution process? Defending the program before different groups on an ongoing basis Presenting the program budget to public forums Conducting program review primarily at the service level on an as-needed basis Presenting and Defending the programs budget primarily to the Office of Management and Budget (OMB) review staff - Answers Defending the program before different groups on an ongoing basis Which is used to create the Acquisition Program Baseline (APB)? Defense Acquisition Management Information Retrieval (DAMIR) Defense Acquisition Executive Summary Report (DAES) Defense Priorities and Allocations System (DPAS) Diminishing Manufacturing Sources and Material Shortages (DMSMS) - Answers Defense Acquisition Management Information Retrieval (DAMIR) KPPs are Performance attributes of a system considered critical to the development of an effective military capability. Which of the following is NOT one of the four mandatory Key Performance Parameters (KPP)? Lethality Force Protection Sustainment Energy - Answers Lethality Which type of Integrated Product Teams (IPTs) focus on seeking opportunities? Working-Level Integrated Project Teams Acquisition Integrated Project Teams Project-Level Integrated Project Teams Execution Integrated Project Teams - Answers working level Which document establishes a simplified and flexible management system for translating joint capability needs and technological opportunities into stable, affordable, and well-managed programs? DoDI 5000.02, Operation of the Defense Acquisition System DoDD 5000.01, The Defense Acquisition System Executive Order 13693 Defense Acquisition Guidebook (DAG) - Answers DoDI 5000.02, Operation of the Defense Acquisition System The intentional disclosure of an offeror's proposed cost and technical information prior to contract award is: All are correct. A violation of the Procurement Integrity Act. Punishable up to 5 years in prison. A violation that could get you reported to the Head of Contracting Activity. - Answers all are correct Which ONE of the following cost estimating factors would be used in calculating MANUFACTURING LABOR hours? Efficiency factor Consumables factor Decrement factor Excess Usage (scrap) factor - Answers efficiency factor Initial Operational Test and Evaluation (IOT&E) occurs in this phase. Production and Deployment Material Solution Analysis Engineering and Manufacturing Development Technology Maturation and Risk Reduction - Answers production and Deployment In which phase of the Defense Acquisition System is competitive prototyping usually required? Technology Maturation & Risk Reduction Material Solution Analysis Engineering & Manufacturing Development Production and Deployment - Answers TMRR Which of the following technical reviews are you most likely to find only in the Production and Deployment phase? Physical Configuration Audit (PCA) Test Readiness Review (TRR) Functional Configuration Audit (FCA) Critical Design Review (CDR) - Answers Physical Configuration Audit (PCA) When should Affordability Goals be established? Milestone A Materiel Development Decision (MDD) Milestone B

Vista previa del contenido

PMT EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

you are the new team lead for an existing team with job satisfaction issues. Using an outside party
you collect a list of specific issues that employees say make the job dissatisfying such as a lack of
recognition. You then create a matrix to plan how to increase satisfaction, such as arrange for high
ranking officials - Answers A) Herbert two factor theory
A software costing method that uses a team of experts working both independently and together to
combine different approaches and arrive at a collective judgment through consensus is an example of
which costing method?

A) Parametric
B) Bottom up
C) Delphi
D) Top down - Answers C) Delphi
which of these is not a benefit of a federally funded research and development centers (FFRDC)?

A) functions as an independent trusted advisor and honest broker
B) responsible only to the government customer
C) has a vested interest in certian technologies or solutions
D) has no profit motive or conflict of interest - Answers C) has a vested interest in certain
technologies or solutions
which of the following is false?

A) exit criteria must be successfully demonstrated before a program can proceed further
B) exit criteria are not specific to a particular phase of an acquisition program
C) exit criteria help manage and reduce risks
D) exit criteria are measurable and demonstratable - Answers B) exit criteria are not specific to a
particular phase of an acquisition program.
exits are specific for programs and entrance are generic, the same for all programs
which of the following is a way the govt communicates requirements to a vendor during a source
selection?

A) request for information
B) statement of work
C) industry day
D) Contract debriefing - Answers B) statement of work
What type of contract provides for payment to the contractor of a negotiated fee that is fixed at the
inception of the contract?

A) contract fixed price award fee
B) contract firm fixed price
C) cost plus incentive fee CPIF
D) cost plus fixed fee CPFF - Answers D) cost plus fixed fee
You are leading an Integrated Product Team (IPT) with members in 4 different locations. You are
putting together a half-day meeting to update them on the current status of the program and prepare
for the next phase. For the last meeting, you flew in 7 team members. This time, you are more open
to other options, so you solicit opinions from the team, via a poll, to determine which approach is
most popular with the team. Which decision-making method would be the best fit?



A) Majority Vote

B) Consensus

C) Authoritative Unilateral

, D) Negotiated - Answers B) Consensus
Your team is tasked to identify the causes of a major failure in a weapons system. Having gone
through a similar task before using the same tools, you apply what was learned to improve your
process this time. This represents which phase of the Experiential Learning Cycle?



Testing in New Situations
Observation and Reflections
Forming Abstract Concepts
Concrete Experience - Answers A testing in new situations
You are a new team lead for an existing team with job satisfaction issues. Using an outside party, you
collect a list of specific issues that employees say make the job dissatisfying, such as a lack of
recognition. You then create a matrix to plan how to increase satisfaction. You are operating based on
the principles of which theory of motivation?



Herzberg Two-factor Theory
Theory X
Expectancy Theory
Theory Y - Answers A Herzberg 2 factor theory
Which of the following is a potential logistics support issue that tends to be associated with the
acquisition of commercial and non-developmental items (NDI)?



Availability of replacement parts

Tradeoff between logistics reliability and system reliability

Human systems integration factors

Design producibility - Answers availability of replacement parts
Which is NOT TRUE about Systems Engineering?



It ensures the lowest possible production cost and shortest program schedule.

It is iteratively applied throughout a system's development.

It is fundamentally a problem solving process.

It addresses issues like supportability and interoperability using the Integrated Product and Process
Development (IPPD) process. - Answers It ensures the lowest possible production cost and shortest
program schedule.
The ___________ companies often centralize staff functions to support all business units; __________
companies often decentralize staff functions, dedicating them to each business or product
organization.



Check Mark Smaller/larger

Larger/smaller

Información del documento

Subido en
29 de junio de 2026
Número de páginas
10
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
joshuawesonga22
3.4
(12)
Vendido
114
Seguidores
2
Artículos
14983
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes