, What is the maximum administrative fine for $10000
abandonment or failure to complete a construction
project?
a single Residential Recovery claim cannot exceed $35000
A delay in work is not a breach of __________ contract
The clause in the subcontractors agreement reads that " a flow down clause
subcontractor binds themselves to the contractor for the
performance of the subcontractors work in the same
manner as the contractor is bound to the owner for such
performance under contractor's contract with the owner."
is called
The most accurate method of estimating is... detail survey method or quantity take off method
The most difficult thing to estimate when preparing a bid labor
is...
If a contract is ambiguous, it goes against whom? the person who wrote it
Why would the owner withhold 10% from each progress Retainage
payment?
Which document is signed by the Owner, change order
Architect/Engineer, and the Contractor informing the
Contractor to modify the agreement terms and
conditions?
What is 2/10 Net 30 2% discount can be deducted if paid within 10 days of the invoice date. Full
payment due in thirty days.
Changes made to the bid documents after they have Addenda
been distributed, but before bids are received
When should construction site drainage first be before submitting your bid
addressed?
Which financial statement summarizes income, costs, and income statement
expenses over a specific period of time?