,For Notice of Right Lien purpose, a commercial A structure that is not used or intended for use as a residential building
improvement is defined as:
I am the residential original contractor and I provide Mortgagee
labor and materials for the project. Who do I need to
give a notice of Right to Lien to?
A quantity survey is also referred to as a: Take Off
Tagout involves placing a warning tag: On an energy-isolation device
Other than Take Off, other common construction estimate Ballpark Estimates
types include all, except:
True or False True
An on-site of host employer is responsible for ensuring a
safe place of employment for leased or temporary
workers.
The state unemployment tax rate varies base on: The history of unemployment claims against the employer.
Stop work order violations can result in: - Any of these could be the result of failure to comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties
The ___________________ gives an overview of the project, Invitation to Bid
deadlines, and general requirements.
"Job Logic" refers to: The sequence of work
True or False False
Self-employment taxes apply to all forms of business
entities.
- Money earned and money spent are accounted for in In the Cash Method
the year they are received or paid, respectively.
The Itemized Summary is the basis for: A complete and accurate estimate of project costs and lists all major items of
work in the order they are to be performed.
,A major difference between the EIN and the BIN is: One is federal and one is state
Poor construction and storage practices can result in Molds and fungus
_________________ inside the structure walls.
Builders now must use corrosion-resistance flashing in Surrounding all interior bedroom doors.
these specified locations, except:
Compliance with environmental regulations can protect a - All of these are correct
contractor from: - Private party lawsuits
- Criminal and civil penalties
- All of these are correct - Liability claims
- Private party lawsuits
- Criminal and civil penalties
- Liability claims
Using the Quantity Take-Off method for estimating, you Labor and materials
begin by estimating the cost of _________________ for each
individual task.
Contractors must apply for permits through: Their local building department
A cost effective method for managing material costs and JIT - Just In Time
keeping inventory costs down is the:
These are materials prohibited form open burning in Unpainted and untreated scrap wood
Oregon except for:
An owner-seller may comply with the Homebuyers - Doing any of these
Protection Act (HPA) by: - Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Doing any of these - Retaining at least 25% of the sales price in escrow
- Purchasing title insurance that does not exclude filed or
unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
, What are the possible consequences that a contractor - All of these are correct
may face if he or she fails to provide the information to - Contractor may be fined
the Owner About Construction Liens when required? - Contractor may lose lien rights
- Contractor may have CCB license suspended
- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
Withheld taxes are considered to be "_____________" funds Trust
that do not belong to the business and cannot be used
for any other purpose.
The major purpose of the building exterior shell is to: Provide protection for the building at its exterior boundaries and to enclose a
suitable interior environment
A project manager can be involved in more than one True
construction project at the same time.
The building exterior shell may consist of: - All of these are part of the building exterior shell
- Only windows and doors
- All of these are part of the building exterior shell - Only exterior wall assemblies
- Only windows and doors - Only roof assemblies
- Only exterior wall assemblies
- Only roof assemblies
Who is responsible for preparing the SDS? The chemical manufacturer
Project includes everything but: Annual office staff salaries
True or False True
"White goods" include water heater, refrigerator, kitchen
stoves, dishwashers, washing machines, and clothes
dryers.
Under the completed contract method (CCM), these are - All of these are deferred until completion
deferred until the project is complete except: - Profits of losses
- Revenue
- All of these are deferred until completion - Costs
- Profits of losses
- Revenue
- Costs