ICC Permit Technician Practice Exam Fully Solved and Updated 2026 (Latest Version Verified for Accuracy) – Complete Certification Exam Review and Practice Question Bank

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

This document contains a fully solved ICC Permit Technician practice exam updated for the 2026 edition, featuring verified answers and structured exam preparation content. It covers key areas such as building code administration, permit application review, zoning and land-use regulations, basic plan reading, inspection coordination, and customer service in permitting departments. The material is designed to help candidates understand exam-style questions, reinforce essential code knowledge, and improve readiness for certification. It serves as a comprehensive study resource for individuals preparing for the ICC Permit Technician examination.

Vista previa del contenido

ICC PERMIT TECHNICIAN PRACTICE EXAM FULLY SOLVED AND
UPDATED 2026 (LATEST VERSION VERIFIED FOR ACCURACY)
2026 LATEST!!!!
According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor Certification must
be performed?

Every 12 Months

If visual monitoring is utilized as the means of release detection for single walled tank, it must be
conducted on a _______ Basis.

Daily

The Purpose of spill and overfill protection equipment is to minimize the potential for a release
during:

Fuel Deliveries

Which of the following is a potential symptom of toxic petroleum exposure:

Dizziness
Tremors
Eye irritation
All of the above(correct)

Under-Dispenser Containment is required for ______ underground storage tank systems

All

All of the following are true for Automatic Tank Gauging (ATG) except for:

ATG system are required to be installed in all UST system

According to CCR Title 23, UST regulations Spill containment (spill bucket) must meet all of the
following requirements except:

Be installed on vent risers

Suction piping may not require leak detection if it has one check valve located where?

Directly below the suction pump

Service Technician performing work on Monitoring equipment must be trained and certified by
__________

The manufacture of the equipment.

Air monitoring must be conducted ________ when performing work within a confined space.

Prior to and during

, A UST Service Technician must be recertified by the equipment Manufacture at the time interval
recommended by the equipment manufacture or at least every ____ months, whichever is greater.

36 Months

When an automatic tank gauge is utilized for single-walled tank leak detection, it shall test the tank at
least monthly after product delivery or when the tank is filled to within _____ percent of the highest
operating level during the previous month.

10

The following is true of spill buckets except:

Must provide drainage for spilled product into the secondary containment sump.

If during an inspection of dispensing equipment at a retail gas station you find that the product is
dispensing at a significant lower rate than usual. You should check:

For piping leaks.

According to CCR title 23, UST Regulations the local agency must be notified by the Owner/Operator
how long before conducting Secondary Containment Testing?

At least 48 hours before the test.

Poppet Valves are a Vapor Recovery Component installed:

on the vapor recovery riser

If equipped with an ATG it shall be programmed to test the tank _______?

at least monthly

A Vacuum-assist nozzle is a component of a(n) ________?

Stage II vapor recovery system

Stage I Vapor Recovery can be installed in the following configured(s):

Dual Point, Manifold, & Coaxial

An Underground tank System includes:

The underground storage tank
Piping
Ancillary Equipment
All of the above is correct

If equipped with an overfill alarm, the alarm must be triggered to alert the delivery operator when the
tank is no more than _______ full.

90%

Approved Cathodic Protection Methodologies include:

Información del documento

Subido en
23 de junio de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TESTBANKSSTORES
4.0
(1)
Vendido
11
Seguidores
1
Artículos
1423
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes