Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

ECC Test 4 with 100% Correct Answers

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

ECC Test 4 with 100% Correct Answers

Vista previa del contenido

ECC Test 4 with 100% Correct
Answers

circuit - ANS-Types of alarm signals and their locations depend on the ______ on which
they are used.

Electronic Signal Unit - ANS-Principal types of audible signals are bells, buzzers, horns,
sirens, and ______.

Chief Engineer (Chain of command) - ANS-Prior to shutdown of an ICSM alarm panels,
authorization must be obtained from the ______.

control - ANS-Power distribution, 60 Hz Ship's Service Generating Plant consist of 3
Ship's Service Gas Turbine Generator sets, with 3 Ship's Service Generator Control
Switchboards 1SG, 2SG, 3SG local plant ______.

boundaries - ANS-The ship is divided into several vertical zones using main subdivision
bulkheads as ______.

Load Center - ANS-Each zone has at least one port and one starboard ______
connected to the respective bus.

75 feet - ANS-How long can the portable flexible cable jumpers, which are provided for
connecting riser terminals to horizontal bulkhead terminals, be?

Bus Ties - ANS-Switchboard 2SP provides Shore Power and the means to power loads
distributed from the other two Switchboards via ______.

damage - ANS-Safety precautions for Shipboard Lining System Operation must always
be taken when working around electrical equipment and circuits to avoid injury,
possibility of death, and equipment ______.

impairment - ANS-The person going from a brightly lighted area to a darkened area
suffers from an immediate ______ of vision.

Light Security - ANS-The use of light traps, door operating switches, darkening the ship
control circuits and material is classification of ______.

5 hours - ANS-A battery powered lighting system provides a continuous illumination for
a minimum of ______ for personal evacuation, and control and operation of the ship.

, transformer - ANS-Each lighting Automatic Bus Transfer provides power from 450 Volts
to 120 Volts step down lighting ______.

evaluated - ANS-Shipboard fatalities have been reported due to contact with 115 Volts
circuits, but all voltages present a risk that must be ______.

alone - ANS-Never work on energized electronic equipment when ______.

Arc Flash rated - ANS-When repair or maintenance must be done on energized circuits
or equipment, a protected ______ coat overalls, hood, and or coveralls must be worn.

300 Volts - ANS-A non-conducting safety line or equivalent shall be attached to the
safety harness or tied around the upper body for work greater than ______.

evolution - ANS-Electrical safety is an all-hands ______.

circuit breaker - ANS-Each Shore Power Feeder is protected at the Ship's Service
Switchboard 2SP by a ______.

closed - ANS-A blue light at the breaker illuminates only when the breaker is ______.

open - ANS-A yellow light at the breaker illuminates only when the breaker is ______.

12 - ANS-How many motor operated circuit breakers are housed by the 2SP
Switchboard?

short circuit - ANS-Electronic short circuit trip device is set at 6300 Amps and trips
instantaneously on ______.

To protect Shipboard systems from damage. - ANS-Why do circuit breakers trip?

Systems used for propelling the ship out of danger. - ANS-Which ship action would
require the use of temporary power connection Casualty Power System?

Switchboard. - ANS-At which location are Casualty Terminals located?

450 Volts. - ANS-How many Volts AC is available for Casualty Power during emergency
situations?

4 feet 6 inches. - ANS-What is the minimum height above deck level that the Bulkhead
Terminal is installed?

When normal source voltage drops below the normal rated voltage. - ANS-When, during
a normal source failure, does the Automatic Bus Transfer Switch transfers a load from a
Normal source to the Emergency source?

Información del documento

Subido en
21 de junio de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
6
Seguidores
2
Artículos
1840
Última venta
3 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes