Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

ICC Permit Technician Practice Exam 2026 | International Code Council (ICC) | 2025–2026 | Fully Solved Practice Questions and Verified Exam Preparation Material

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

This document contains a comprehensive collection of ICC Permit Technician practice exam questions with verified answers and detailed solutions for 2026 exam preparation. It covers key topics including zoning regulations, occupancy classifications, permit processing, code administration, legal aspects of code enforcement, plan review procedures, and building department operations. Based on the available information, the material is designed to help candidates familiarize themselves with common exam formats and frequently tested concepts. The content serves as a useful study resource for individuals preparing for the ICC Permit Technician certification examination.

Vista previa del contenido

ICC PERMIT TECHNICIAN PRACTICE EXAM FULLY SOLVED AND
UPDATED 2026 (LATEST VERSION VERIFIED FOR ACCURACY)
2026 LATEST!!!!
Erection, construction, alteration, extension, repair, moving, removal, demolition, or occupancy of a
structure in violation of the code, permit, or certificate issued

Under what conditions should a notice of violation be issued?

Work being performed in a manner contrary to the code, or in a dangerous or unsafe manner,
Working without a permit

When should a stop work order be issued?

Fines that the jurisdiction establish

What are the consequences of continuing work after issuance of a stop work order?

shall be removed or made safe by following codes and permits,
building official makes an official report and delivers it to the owner and keeps a copy for the office

How are unsafe structures addressed?

Shall comply with all applicable requirements associated with such potential multipurpose

How is a space to be used @ different times for different purposes handled?

Shall be classified in the occupancy it most nearly resembles based on fire safety and relative hazard

How is an occupancy that is not specifically described classified?

gathering of person for purposes such as civic, social, or religious functions

recreation, food, or drink consumption, or awaiting transportation

What types of activities are considered assembly?

Assembly Group A

What are assembly activities generally classified as?

Group B Classification

How are small assembly uses classified where accessory to a different occupancy?

Assembly Group A-2

What is the classification for places like: restaurants, theaters, churches, conference rooms, libraries,
arenas, and grandstands?

Businesses

What is the most common use classified as Group B?

, Children-12th grade

Group E describes educational uses for individuals of what age group?

More than 5 children that are older than 2 1/2 years old that receive education or care for fewer than
24 hours

Which type of day care are considered Group E occupancies?

Low hazard and high hazard

How do the 2 divisions of factory use differ from each other?

Materials that constitute a physical or health hazard in quantities in excess outside of "control areas"

What types of operations or materials cause a use to be considered Group H?

H-1

What occupancy addresses explosion hazard?

H-3

What occupancy addresses physical hazard?

H-4

What occupancy addresses health hazard?

Jail or Prison
Care Facilities
Group Homes
Assisted Living

Which characteristics are typical of a Group I Occupancy?

Institutional Group I-2 and I-3

In which institutional occupancies are the occupants considered incapable of self-preservation?

5 or fewer people with custodial care of receiving medical care

For which type of institutional uses may the International Residential Code (IRC) be utilized?

Building used for display or sale of merchandise

What general type of building is considered a Group M Occupancy?

Factory Group F-1

Manufacturing operations fall into what occupancy group?

Building used for sleeping purposes & not classified as an Institutional Group I

How are residential occupancies classified?

Información del documento

Subido en
18 de junio de 2026
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TopGradeSolutions
4.9
(174)
Vendido
107
Seguidores
9
Artículos
13450
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes