three things that are looking into during a DR's plan review -
ANSWER ✔✔application
site evaluation
design of planning material
, when should the application fees collected be submitted to the TCEQ -
ANSWER ✔✔when the TCEQ bills for it after the monthly submittal
what components does the site evaluation need to have - ANSWER
✔✔soil texture
soil depth
restrictive horizon
GW table
topography
flood hazards
lot size
site suitability
Edward's Aquifer protection
if any of the criteria in the application, site evaluation, or planning
materials are not met can a permit be issued - ANSWER ✔✔no
what to review when looking at the treatment unit planning material -
ANSWER ✔✔proper treatment capacity
adequate soil disposal
appropriate treatment unit