CORRECT ANSWERS 100% VERIFIED
2026/2027 | GUARANTEED PASS.
◉ Which of the following correctly identifies what is included in
legitimate labor costs? Answer: D. Hourly wages, fridge benefit
packages, payroll taxes insurance and safety costs, and small tools and
consumables
◉ Which in the following best illustrates the PRIMARY role of a
foreman? Answer: B. To Effectively manage and lead the crew
◉ As a foreman what should ALWAYS be your FIRST priority when
planning of a project? Answer: B. Developing a job strategy before the
job begins
◉ Which of the following describe the purpose of Short Interval
Planning or Look ahead planning? Answer: A. Breaking the job into
small manageable pieces
,◉
◉
Which of the following is the FIRST thing a foreman must do before
beginning to plan a job? Answer: A. Read all the projectrelated
documents
Which of the following provides the BEST example of
prefabrication? Answer: A. To Create a product in the shop and install it
in the field
◉ Which of the following purchasing procedures is MOST likely to
reduce material handling time? Answer: A. Bag and Tag all materials as
appropriate
◉ What should a foreman do if damage to he/she is discovered AFTER
the delivery driver has left the job site? Answer: C. Notify the Project
manager and note the damage on the daily log.
Which of the following location represents the BEST place to store
job site materials in a manner that enhance says productivity? Answer:
D. As close to the point of installation as possible
◉ With which of the following costs should a foreman be MOST
concerned? Answer: A. Labor
, ◉
◉ Which of the following is NOT considered a DIRECT job cost?
Answer: D. Home office overhead
◉ Which of the following is NOT required on a daily log? Answer: C.
The work completed by the individual crew members
◉ Which of the following is NOT likely to lead to improved material
handling? Answer: D. Have all the materials and equipment delivered at
the beginning of the job
◉ As a foreman what should ALWAYS be your FIRST priority when
planning a job? Answer: D. Keeping the crew actively engaged in
completing their work
◉ During the course of a project you have noticed that there is a greater
than normal number of Change orders being submitted. Which of the
following is the MOST important step that you need to take? Answer: C.
Maintain an accurate job log in case specific questions are asked about
why the project was completed in ways it was.
A "Log Book" is the most appropriate place to document which of the
following? Answer: A. The events that occurred on the job site each day.