SIX SIGMA GREEN BELT CERTIFICATION EXAM QUESTIONS COMPLETE WITH 100% CORRECT ANSWERS Question 1 Which of the following best defines a "Critical to Quality" (CTQ) characteristic? A) A metric tracked only at the project’s closure B) A requirement derived from internal process goals C) A measurable defect that is always binary D) A characteristic that directly impacts customer satisfaction Correct Answer: D Explanation: CTQ characteristics are identified from the Voice of the Customer (VOC) and represent product or service features that have a direct impact on customer satisfaction or dissatisfaction. They are measurable and actionable, not merely internal. ________________________________________ Question 2 In a control chart, which rule suggests an out-of-control process? A) A single point within 1 sigma of the mean B) All points within control limits C) Fifteen points in a row within ±1 sigma of centerline D) A run of 7 points all below the centerline Correct Answer: D *Explanation: A run of 7 consecutive points on the same side of the centerline (above or below) is a Western Electric rule indicating a shift in the process mean, even if all points are within control limits. Fifteen points within ±1 sigma may actually suggest reduced variation but not necessarily out-of-control; seven points in a row below is a signal.* ________________________________________ Question 3 Which Lean tool is most appropriate for reducing waiting time between process steps? A) Poka-Yoke B) Value Stream Mapping C) Control Chart D) FMEA Correct Answer: B Explanation: Value Stream Mapping visually maps material and information flow, highlighting waiting time, non-value-added steps, and inventory buffers. Poka-Yoke prevents errors, FMEA assesses risk, and control charts monitor stability. ________________________________________ Question 4 A process has a Cp of 1.2 and a Cpk of 0.7. What does this indicate? A) The process is centered and capable B) The process is not capable and not centered C) The process is capable but not centered D) The process is centered but not capable Correct Answer: C *Explanation: Cp measures potential capability if centered (1.33+ is typical target). Cpk measures actual capability accounting for centering. Here Cp=1.2 (1) means potential capability exists, but Cpk=0.7 (1) indicates the mean is off-center, causing defects.* ________________________________________ Question 5 Which phase of DMAIC primarily involves hypothesis testing and root cause confirmation? A) Define B) Measure C) Analyze D) Improve Correct Answer: C Explanation: The Analyze phase focuses on identifying and verifying root causes using statistical tools (t-tests, ANOVA, chi-square, regression) and hypothesis testing. Define sets scope, Measure collects baseline data, Improve implements solutions. ________________________________________ Question 6 What does a Pareto chart help prioritize? A) The most frequent causes of defects B) The correlation between two variables C) The stability of a process over time D) The capability of a process Correct Answer: A *Explanation: Based on the 80/20 rule, a Pareto chart ranks categories of defects or causes by frequency/impact, directing improvement efforts to the “vital few” rather than the “trivial many.”* ________________________________________ Question 7 A Six Sigma Black Belt wants to compare the mean cycle time before and after an improvement. The same process is measured on the same days. Which test is appropriate? A) Two-sample t-test B) Paired t-test C) One-way ANOVA D) Chi-square test Correct Answer: B Explanation: Paired t-test is used when observations are naturally paired (e.g., before-after measurements on the same unit or same day), reducing variability due to differences between samples. Two-sample t-test assumes independent groups. ________________________________________ Question 8 Which of the following is a common tool for mistake-proofing? A) 5S B) Poka-Yoke C) Kaizen Blitz D) SIPOC Correct Answer: B *Explanation: Poka-Yoke (Japanese for “mistake-proofing”) designs mechanisms to prevent errors or detect them immediately, such as sensors, guides, or checklists. 5S organizes workspace, Kaizen Blitz is rapid improvement, SIPOC maps high-level process.* ________________________________________ Question 9 In the Measure phase, which metric is defined as (Total opportunities – Total defects) / Total opportunities? A) Sigma level B) Defects per unit (DPU) C) Rolled throughput yield D) First time yield Correct Answer: D Explanation: First time yield (FTY) = units that pass without rework / total units started. Formula given is for FTY. Rolled throughput yield multiplies FTY across steps. DPU = defects/units.

Mostrar más Leer menos
Institución
Six Sigma Green Belt
Grado
Six Sigma Green Belt

Vista previa del contenido

SIX SIGMA GREEN BELT CERTIFICATION EXAM
QUESTIONS COMPLETE WITH 100% CORRECT
ANSWERS




Question 1
Which of the following best defines a "Critical to Quality" (CTQ) characteristic?
A) A metric tracked only at the project’s closure
B) A requirement derived from internal process goals
C) A measurable defect that is always binary
D) A characteristic that directly impacts customer satisfaction
Correct Answer: D
Explanation: CTQ characteristics are identified from the Voice of the Customer
(VOC) and represent product or service features that have a direct impact on
customer satisfaction or dissatisfaction. They are measurable and actionable, not
merely internal.


Question 2
In a control chart, which rule suggests an out-of-control process?
A) A single point within 1 sigma of the mean
B) All points within control limits
C) Fifteen points in a row within ±1 sigma of centerline
D) A run of 7 points all below the centerline
Correct Answer: D
*Explanation: A run of 7 consecutive points on the same side of the centerline
(above or below) is a Western Electric rule indicating a shift in the process mean,
even if all points are within control limits. Fifteen points within ±1 sigma may

,actually suggest reduced variation but not necessarily out-of-control; seven points
in a row below is a signal.*


Question 3
Which Lean tool is most appropriate for reducing waiting time between process
steps?
A) Poka-Yoke
B) Value Stream Mapping
C) Control Chart
D) FMEA
Correct Answer: B
Explanation: Value Stream Mapping visually maps material and information flow,
highlighting waiting time, non-value-added steps, and inventory buffers. Poka-Yoke
prevents errors, FMEA assesses risk, and control charts monitor stability.


Question 4
A process has a Cp of 1.2 and a Cpk of 0.7. What does this indicate?
A) The process is centered and capable
B) The process is not capable and not centered
C) The process is capable but not centered
D) The process is centered but not capable
Correct Answer: C
*Explanation: Cp measures potential capability if centered (1.33+ is typical target).
Cpk measures actual capability accounting for centering. Here Cp=1.2 (>1) means
potential capability exists, but Cpk=0.7 (<1) indicates the mean is off-center,
causing defects.*


Question 5
Which phase of DMAIC primarily involves hypothesis testing and root cause

,confirmation?
A) Define
B) Measure
C) Analyze
D) Improve
Correct Answer: C
Explanation: The Analyze phase focuses on identifying and verifying root causes
using statistical tools (t-tests, ANOVA, chi-square, regression) and hypothesis
testing. Define sets scope, Measure collects baseline data, Improve implements
solutions.


Question 6
What does a Pareto chart help prioritize?
A) The most frequent causes of defects
B) The correlation between two variables
C) The stability of a process over time
D) The capability of a process
Correct Answer: A
*Explanation: Based on the 80/20 rule, a Pareto chart ranks categories of defects
or causes by frequency/impact, directing improvement efforts to the “vital few”
rather than the “trivial many.”*


Question 7
A Six Sigma Black Belt wants to compare the mean cycle time before and after an
improvement. The same process is measured on the same days. Which test is
appropriate?
A) Two-sample t-test
B) Paired t-test
C) One-way ANOVA
D) Chi-square test

, Correct Answer: B
Explanation: Paired t-test is used when observations are naturally paired (e.g.,
before-after measurements on the same unit or same day), reducing variability
due to differences between samples. Two-sample t-test assumes independent
groups.


Question 8
Which of the following is a common tool for mistake-proofing?
A) 5S
B) Poka-Yoke
C) Kaizen Blitz
D) SIPOC
Correct Answer: B
*Explanation: Poka-Yoke (Japanese for “mistake-proofing”) designs mechanisms to
prevent errors or detect them immediately, such as sensors, guides, or checklists.
5S organizes workspace, Kaizen Blitz is rapid improvement, SIPOC maps high-level
process.*


Question 9
In the Measure phase, which metric is defined as (Total opportunities – Total
defects) / Total opportunities?
A) Sigma level
B) Defects per unit (DPU)
C) Rolled throughput yield
D) First time yield
Correct Answer: D
Explanation: First time yield (FTY) = units that pass without rework / total units
started. Formula given is for FTY. Rolled throughput yield multiplies FTY across
steps. DPU = defects/units.

Escuela, estudio y materia

Institución
Six Sigma Green Belt
Grado
Six Sigma Green Belt

Información del documento

Subido en
13 de junio de 2026
Número de páginas
113
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$17.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
maingirose Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
9
Miembro desde
3 meses
Número de seguidores
0
Documentos
804
Última venta
4 días hace
MaingiRose

THE PREMIUM STUDY RESOURCE HUB – VERIFIED ANSWERS FOR EVERY LEARNER COMPREHENSIVE STUDY GUIDES DESIGNED FOR SUCCESS. EVERY QUESTION NUMBERED. EVERY ANSWER CONFIRMED. DETAILED EXPLANATIONS THAT BUILD UNDERSTANDING. ALL ANSWER CHOICES INCLUDED FOR COMPLETE PREPARATION. CLEAR, ACCURATE, AND EASY TO USE. FORMATTED FOR QUICK REFERENCE AND FAST LEARNING. PERFECT FOR STUDENTS, PROFESSIONALS, AND LIFELONG LEARNERS SEEKING RELIABLE, TRUSTWORTHY MATERIALS. COMPLETE PATIENT CASE ANALYSES WITH SOAP NOTES. COMPREHENSIVE Q&amp;A COLLECTIONS WITH STEP-BY-STEP RATIONALES. TECHNICAL GUIDES WITH PRACTICAL APPLICATIONS. ALL CONTENT VERIFIED FOR ACCURACY. YOUR TRUSTED SOURCE FOR QUALITY STUDY MATERIALS. MASTER YOUR SUBJECTS. STUDY SMARTER. ACHIEVE MORE.

Lee mas Leer menos
5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes