DBIA EXAM 1 QUESTIONS AND ANSWERS 100%
VERIFIED 2026



belief that there is a technique, method or process that is more effective at delivering a parti
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




cular outcome than any other - ans-best practice
xc xc xc xc xc xc xc




With ..........., a desired outcome can be delivered with fewer problems and unforeseen com
xc xc xc xc xc xc xc xc xc xc xc xc xc




plications - ans-proper process, checks and testing xc xc xc xc xc xc




Implementing these practices on any type of design- xc xc xc xc xc xc xc




build project ........ the probability of a successful project that meets the expectations of all st
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




akeholders - ans-increases xc xc




If these practices are ..... implemented, there is an ............... that the .............. and that som
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




e or all of the stakeholders will be disappointed. - ans-
xc xc xc xc xc xc xc xc xc xc




NOT, increased probability, project's performance will be compromised
xc xc xc xc xc xc xc




high level principles, organized into procurement, contracting, and execution topics, 10 in t
xc xc xc xc xc xc xc xc xc xc xc xc




otal - ans-best practices
xc xc xc




ways to implement the best practices, essentially "mini" best practices, 59 in total - ans-
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




implementing techniques xc




key factor in project success - ans-
xc xc xc xc xc xc




owner's choice of project delivery system and procurement approach
xc xc xc xc xc xc xc xc




in procuring the DB services philosophy, owners should: - ans-
xc xc xc xc xc xc xc xc xc




consider the particulars and circumstances of each project, make strategic decisions
xc xc xc xc xc xc xc xc xc xc




An Owner should conduct a ............... of the ............. of its .............. before deciding to use
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




design-build. - ans-proactive and objective assessment, unique characteristics, program/ xc xc xc xc xc xc xc xc




project and its organization xc xc xc




An Owner should implement a procurement plan that enhances collaboration and other be
xc xc xc xc xc xc xc xc xc xc xc xc




nefits of Design-Build and is in harmony with the reasons that the Owner chose the design-
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




build delivery system. - ans-enhances collaboration, harmony
xc xc xc xc xc xc




An Owner using a competitive design-
xc xc xc xc xc




build procurement that seeks price and technical proposals should
xc xc xc xc xc xc xc xc




(a)
establish .......... evaluation and selection processes;
xc xc xc xc xc

,(b)
ensure that the process is ............................; and
xc xc xc xc xc xc




(c)
value ........................... in the selection process. - ans-
xc xc xc xc xc xc xc




clear; fair, open, and transparent; both technical concepts and price
xc xc xc xc xc xc xc xc xc




the fix to the trust issue: - ans-
xc xc xc xc xc xc xc




picking the right team; giving flexibility, opportunity to succeed, and accountability; reward f
xc xc xc xc xc xc xc xc xc xc xc xc




or superior performance
xc xc




the core of every DBIA cert course is: - ans-Design Build Done Right
xc xc xc xc xc xc xc xc xc xc xc xc




select the best combination of: xc xc xc xc




each project is unique so: - ans-
xc xc xc xc xc xc




project delivery system; procurement method; contracting approach
xc xc xc xc xc xc




make informed choices xc xc




how team members are organized
xc xc xc xc




e.g., design build, design bid build, cm at risk - ans-project delivery systems
xc xc xc xc xc xc xc xc xc xc xc xc




how team members are organized
xc xc xc xc




e.g., QBS, best value, low price, sole source - ans-procurement method
xc xc xc xc xc xc xc xc xc xc




how team members are paid
xc xc xc xc




e.g., fixed price, GMP, cost reimbursement, target price, unit price - ans-
xc xc xc xc xc xc xc xc xc xc xc




contracting approach xc




in developing acquisition strategies, some factors to consider are: - ans-
xc xc xc xc xc xc xc xc xc xc




owner objectives; unique project considerations; owner profile and personality; marketplac
xc xc xc xc xc xc xc xc xc




e conditions
xc




some owner objectives are: - ans-
xc xc xc xc xc




control; relationships; project budget; project schedule; risks
xc xc xc xc xc xc




what are some unique project considerations? - ans-
xc xc xc xc xc xc xc




stakeholder role and involvement; procurement constraints & flexibilities; budget and sche
xc xc xc xc xc xc xc xc xc xc




dule; pool of qualified contractors and designers; project size and/
xc xc xc xc xc xc xc xc xc




or complexity; critical project features
xc xc xc xc




Owners should ................................. imposed or ............. afforded by their legislative, regu
xc xc xc xc xc xc xc xc xc xc




latory, or internal requirements. - ans-understand all procurement constraints; flexibilities
xc xc xc xc xc xc xc xc xc

, Owners should ......................................................................................., as stakeholder g
xc xc xc xc xc




oals, expectations, challenges, constraints, and priorities should guide all project planning
xc xc xc xc xc xc xc xc xc xc xc




and procurement activities, including the determination and implementation of design exce
xc xc xc xc xc xc xc xc xc xc




llence and sustainability. - ans-
xc xc xc xc




identify and involve key project stakeholders at the early stages of project planning
xc xc xc xc xc xc xc xc xc xc xc xc




what are some market considerations? - ans-
xc xc xc xc xc xc




experience and availability of qualified design professionals and contractors; prevalent proj
xc xc xc xc xc xc xc xc xc xc




ect delivery systems; market conditions; bonding environment; competing projects
xc xc xc xc xc xc xc xc




Owners should carefully research and assess ............................. as they plan their design-
xc xc xc xc xc xc xc xc xc xc xc




build programs, as this will ................................................................ Among the issues to b
xc xc xc xc xc xc xc xc xc xc




e researched and assessed include:
xc xc xc xc




(a)
............... ................ that could limit or expand competition;
xc xc xc xc xc xc xc




(b)
projected ........... ......... ......... ........ ........;
xc xc xc xc xc




(c)
................. ............... from similar projects; and xc xc xc xc xc




(d)
........... of budget and schedule estimate. - ans-
xc xc xc xc xc xc xc




current market conditions; identify potential risks and opportunities
xc xc xc xc xc xc xc




procurement actions; labor material and equipment availability; lessons learned; realism
xc xc xc xc xc xc xc xc xc




what are critical questions for establishing a project acquisition strategy? - ans-
xc xc xc xc xc xc xc xc xc xc xc




most important objective; biggest project concern; involvement of key stakeholders; ability t
xc xc xc xc xc xc xc xc xc xc xc




o delegate authority to make prompt decisions; rules governing procurement; owner's pers
xc xc xc xc xc xc xc xc xc xc xc




onality and culture xc xc




what is a project delivery system? - ans-
xc xc xc xc xc xc xc




Establishes roles of parties; determines sequence of design, procurement, and constructio
xc xc xc xc xc xc xc xc xc xc




n; influences responsibility for and impact of changes in the work
xc xc xc xc xc xc xc xc xc xc




Owners should ................................................................................. of design-
xc xc xc xc




build and ......................................................................... as to
xc xc xc xc xc




whether the use of design-build will benefit their program/project. - ans-
xc xc xc xc xc xc xc xc xc xc




understand the potential benefits, limitations, and attributes; make an informed decision
xc xc xc xc xc xc xc xc xc xc




what is a master builder? - ans-architect, designer, and engineer in one
xc xc xc xc xc xc xc xc xc xc xc




what was segregation of project delivery? - ans-segregated architects and construction
xc xc xc xc xc xc xc xc xc xc

Escuela, estudio y materia

Institución
DBIA Practice
Grado
DBIA Practice

Información del documento

Subido en
13 de junio de 2026
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DeligentSuccess Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18
Miembro desde
10 meses
Número de seguidores
1
Documentos
1022
Última venta
2 semanas hace
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes