Answers
1. A stakeholder team is holding a collaborative meeting (design
charrette) to discuss the site development and construction of a new
building project. The three-acre site is located on a busy street in an
area of dense population, with wetlands nearby. The team is
brainstorming possible commercial ideas for the property.
The team is dedicated to protecting the nearby wetlands.
Which type of civil engineer should they invite to collaborate with
them to address the wetlands concern?: Environmental Engineer
2. A stakeholder team is holding a collaborative meeting (design
charrette) to discuss the site development and construction of a new
building project. The three-acre site is located on a busy street in an
area of dense population, with wetlands nearby. The team is
brainstorming possible commercial ideas for the property.
One member of the team compiles a list of all the stakeholder
feedback during the brainstorming session and compiles a
stakeholder input analysis.
Which phase of the project life cycle is the team participating in?:
1/
14
, Initiating
3. A stakeholder team is holding a collaborative meeting (design
charrette) to discuss the site development and construction of a new
building project. The three-acre site is located on a busy street in an
area of dense population, with wetlands nearby. The team is
brainstorming possible commercial ideas for the property.
At the start of the stakeholder meeting, a team member takes the
lead in establishing group norms.
What activity is the lead team member working on to develop the
team?: Devel- oping guidelines, protocols, or rules
4. During a storm, high straight-line winds blew a construction
crane into a building, causing major structural damage to the
building. Your structural
engineering company has been hired to analyze the damage and
determine what repairs should be made to the building. Your
team is responsible for checking and verifying the calculations
associated with the selected beams affected by the storm.
While reviewing previous structural calculations, you realize the live
loads were not considered in the overall load calculations. The load
information for the building is:
2/
14