Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 30 páginas
Examen

AFSB 152 THE INSTITUTES EXAM SCRIPT 2026 FULL SOLUTION QUESTIONS AND ANSWERS GRADED A+

Document preview thumbnail
Vista previa 3 fuera de 30 páginas

AFSB 152 THE INSTITUTES EXAM SCRIPT 2026 FULL SOLUTION QUESTIONS AND ANSWERS GRADED A+

Vista previa del contenido

AFSB 152 THE INSTITUTES EXAM SCRIPT
2026 FULL SOLUTION QUESTIONS AND
ANSWERS GRADED A+

⩥ Which one of the following describes what happens if there are gaps
or omissions in the construction plans and specifications when they are
offered in the competitive bid process, and they are discovered after the
construction begins?
- The contractor must make the changes at its own costs because it failed
to notice the gaps or omissions before placing a bid to contract for the
project
- The project owner must pay additional money to the contractor in the
form of change orders during the course of construction
- The contractor must complete the project according to the plans and
specifications, and the owner must contract to correct the problems when
the construction is completed
- The contractor must make the changes and negotiate with the project
owner to share the costs of the changes.
Answer: The project owner must pay additional money to the contractor
in the form of change orders during the course of construction


⩥ Sheldon Contracting was hired as the general contractor for a large
commercial project. The general contractor is responsible to the owner
for

,- Properly constructing the project in accordance with the plans and
specifications and in the prescribed time period
- Furnishing an estimated project cost that can be used to negotiate
financing with lending institutions
- Engaging consultants in fields for which he or she lacks the expertise
necessary for the particular project
- Defining the project through specifications that, if built in accordance
with their terms, fulfill the owner's expectations.
Answer: Properly constructing the project in accordance with the plans
and specifications and in the prescribed time period


⩥ Which one of the following in a construction contract would make
failure to promptly complete a project a material breach of contract?
- Time is of the essence provision
- Time for completion clause
- Retainage
- Force majeure clause.
Answer: Time is of the essence provision


⩥ A contractor may take advantage of saved costs, when estimating
materials and equipment, by
- Ordering all supplies for the project from a single supplier or from a
given manufacturer

, - Considering the costs of expendable equipment that will be lost,
damaged, or worn out during the project
- Considering reuse of materials that were used temporarily in one
project in a subsequent project
- Considering the costs of equipment that is needed to install certain
building features and any required assembly time.
Answer: Considering reuse of materials that were used temporarily in
one project in a subsequent project


⩥ Crowley Construction was bidding on a large construction contract for
Wolff Properties. Crowley Construction was named as the principal on a
bid bond. A bid bond guarantees that if the contract is awarded to the
principal,
- The principal will sign the contract within a specified time after the
award and furnish the required performance and payment bonds
- The surety will pay the percentage bond penalty or the difference
between the principal's bid and the next lowest bid, whichever is greater,
if the principal defaults on the bond
- The principal will complete the contract as described in the
specifications and within the time specified
- The surety will pay the costs to complete the project if the principal
fails to complete it.
Answer: The principal will sign the contract within a specified time after
the award and furnish the required performance and payment bonds

Información del documento

Subido en
10 de junio de 2026
Número de páginas
30
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GradeGalaxy
4.4
(9)
Vendido
132
Seguidores
3
Artículos
44308
Última venta
3 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes