Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 47 páginas
Examen

AFSB 152 CERTIFICATION EXAM 2026 COMPLETE Q AND A PREP PACK

Document preview thumbnail
Vista previa 4 fuera de 47 páginas

AFSB 152 CERTIFICATION EXAM 2026 COMPLETE Q AND A PREP PACK

Vista previa del contenido

AFSB 152 CERTIFICATION EXAM 2026
COMPLETE Q AND A PREP PACK

◉ Lido Roofing's work is generally subject to an implied warranty.
Which one of the following statements is correct regarding an
implied warranty for a roofing contractor?
- It typically applies for a 20-year period.
- It begins with the purchase of the materials.
- It does not begin until installation is completed.
- It includes coverage for excessive wear and tear.
Answer: It does not begin until installation is completed.


◉ Which one of the following is correct regarding the contractor's
risk in a cost-plus contract?
- The contractor's risk in a cost-plus contract is higher than it would
be in a fixed-price contract.
- There is more risk in a cost-plus contract than in a unit-price
contract.
- Cost-plus contracts expose the contractor to little or no risk
because costs are reimbursed.
- The "plus" in a cost-plus contract is a fixed amount and is not
related to the contractor's risk.

,Answer: Cost-plus contracts expose the contractor to little or no risk
because costs are reimbursed.


◉ KB Contracting entered a firm fixed-price contract to build a new
location for Mullen Markets. The construction contract includes a
bonus clause. Under this arrangement, KB Contracting will most
likely earn an incentive if it does which one of the following?
- Completes the job at a cost at least 5% below the original bid price.
- Completes the job with exceptional savings in both cost and time.
- Completes the work with exemplary quality.
- Completes the work within the prescribed period of time.
Answer: Completes the work within the prescribed period of time.


◉ Wilson Contracting was awarded a large federal construction
project. The Miller Act requires a contractor on a federal project to
post
- A performance bond and a labor and material payment bond.
- A labor and material payment bond only.
- A performance bond only.
- A bond covering state liens.
Answer: A performance bond and a labor and material payment
bond.

,◉ When estimating the costs for labor, in addition to the capabilities
of the available labor force, the estimator must be familiar with
- Union and local regulations that might affect what work a
particular subcontractor can perform
- The subcontractor's hours of operation and overtime guidelines
- Any union labor limitations for specialized laborers who work on
private construction projects
- The profit margins that are customary for similar types of jobs in
the market
Answer: Union and local regulations that might affect what work a
particular subcontractor can perform


◉ Which one of these statements most accurately describes the laws
and regulations with which architects must comply?
- A. Architects must comply with all federal, state, and local laws,
regulations, ordinances, requirements, and codes that apply to
construction projects
- Architects must comply with all federal, state, and local laws,
regulations, ordinances, requirements, and codes, as well as with
regulations and licensing requirements of the architectural
profession
- Architects must comply with regulations and licensing
requirements of the architectural profession, along with regulations
and licensing requirements for the construction firms

, - Architects must comply with regulations and licensing
requirements of the architectural profession, which takes
precedence over all other regulations and ordinances
Answer: Architects must comply with all federal, state, and local
laws, regulations, ordinances, requirements, and codes, as well as
with regulations and licensing requirements of the architectural
profession


◉ When contract documents specifically request two or more
alternative quotes (such as one with and one without some feature),
the contractor
- Should investigate the advantages and disadvantages of the
alternatives and include them in separate bids for each alternative
- Can choose to bid on only one of the quotes but must explain why
only one quote is furnished
- Should include any qualifying conditions for the alternatives, which
could ensure the contractor's responsiveness
- Must clearly furnish each of the requested quotes, or the bid might
be judged nonresponsive
Answer: Must clearly furnish each of the requested quotes, or the
bid might be judged nonresponsive


◉ One of the purposes of bid bonds is
- To assure the owner of completion of the project in the least
amount of time possible

Información del documento

Subido en
10 de junio de 2026
Número de páginas
47
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GradeGalaxy
4.4
(9)
Vendido
132
Seguidores
4
Artículos
44319
Última venta
4 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes