Miller Act 1935 - ANSWER>>Federal Government passed bond requiring payment
and performance bonds on all public works, what year?

Brooks Bill 1972 - ANSWER>>Bill directing A/E's selected on qualifications, what
year?

Clinger Cohen Act/Defense Procurement Reform Act 1996 - ANSWER>>Allows all
federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build.

Standard of Care - ANSWER>>The level of quality that any average Design
Professional would be able to perform given the circumstances.

Design Bid Build - ANSWER>>Slowest Project Delivery method, linear in nature,
prescriptive (owner knows what they want),

Multi Prime - ANSWER>>Project Delivery - Many contracts through Owner

CM at Risk - ANSWER>>Project Delivery method allowing the contractor to come
on board very early in design for preconstruction services yet maintains
separation between Designer and Builder contractually.

Design Build - ANSWER>>Fastest Project Delivery method, fast tracking possible
overlapping design with construction utilizing incremental packages.

Low Bid - ANSWER>>Procurement Method - Most Familiar

, Negotiated (Qualifications Based) - ANSWER>>Procurement Method - Common
for A/E

Best Value - ANSWER>>Procurement Method - Qualifications and Price

Sole Source - ANSWER>>Procurement Method - Direct

Lump Sum - ANSWER>>Contract Format w/ agreed upon fixed price

Cost Plus Fee - ANSWER>>Contract Format - contractor reimbursed for actual cost
plus an agreed upon percentage

GMP (Guaranteed Maximum Price) - ANSWER>>Contract Format - Combines Cost-
Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a
certain amount.

Unit Price - ANSWER>>Contract Format - cost per piece

Target Price - ANSWER>>Contract Format - established cost/benchmark
determined jointly by project team.

Trust, Flexibility - ANSWER>>Successful Design Build requires _____ & _______
between participants

Hammurabi - ANSWER>>Singular responsibility for both design & construction
was first codified by ____

Bridging Documents - ANSWER>>Owner provided items such as 20% design or
more and provides prescriptive specs at RFP.

Spearin Doctrine - ANSWER>>Owner is responsible for implied warranties in the
sufficiency of the specifications.

Información del documento

Subido en
10 de junio de 2026
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
LeeErickson
1.5
(2)
Vendido
12
Seguidores
1
Artículos
3425
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes