Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

CM 2215 EVALUATION OSHA EXAM QUESTIONS AND ANSWERS SURE

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

CM 2215 EVALUATION OSHA EXAM QUESTIONS AND ANSWERS SURE

Vista previa del contenido

CM 2215 EVALUATION OSHA EXAM QUESTIONS
AND ANSWERS SURE A+
✔✔Failure to inspect for oil or grease on regulator fittings, valves, or the cap threads on
a cylinder of oxygen can result in _____ or _____ - ✔✔fire

explosion.

✔✔An "Assured equipment grounding conductor program" deals with the cord-set and
receptacles which are not part of the ______ ______ of a building. - ✔✔permanent
wiring

✔✔_____ volts or greater is the maximum voltage before guarding is required against
accidental contact by cabinets, other forms of enclosures, or by location in a room or
enclosure accessible only to qualified persons (electricians). - ✔✔50

✔✔The practice of connecting two metallic objects to prevent static sparks is called
_____. - ✔✔bonding

✔✔Before the start of any work covered under Subpart V - Power Transmission and
Distribution, existing conditions are determined by an _____ or _____ - ✔✔inspection

, test.

✔✔_____ and _____ protection equipment used to protect against hazards shall meet
the requirements specified in ANSI Z87.1. - ✔✔Eye

face

✔✔Respirators used in the construction industry are covered under OSHA standard
1910._____. - ✔✔134

✔✔Accident prevention signs such as; danger, caution and exit signs
_________________ when work is being performed. - ✔✔shall be visible

✔✔A material chute used during demolition operations must be enclosed when its angle
is equal to or greater than ______________ from the horizontal - ✔✔45 degrees

✔✔__________ is the trigger height when the masonry walls must be braced. - ✔✔8
feet

✔✔When a masonry wall is being constructed, a limited access zone at least the height
of the wall plus a minimum of _____ feet tall shall be established on the side of the wall
without scaffolding. - ✔✔4

✔✔Except for extra-heavy-duty metal or plastic portable ladders, all portable ladders
must support ____ times the maximum intended load. - ✔✔4

✔✔Portable ladders with structural defects such as, broken or missing rungs or split
rails shall be __________ from service until repaired. - ✔✔removed

✔✔According to OSHA, portable containers used to provide drinking water shall be
tightly __________ and equipped with a _______. - ✔✔closed

tap

✔✔______ contaminants is toxic to both male and female reproductive systems and
can create significant exposures to workers removing paint from bridges, renovating
residences, and demolishing or salvaging structures. - ✔✔lead

✔✔Rigging equipment for material handling shall be inspected prior to use on _____
_____ and as necessary _____ _____. - ✔✔each shift

during use

Información del documento

Subido en
9 de junio de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$19.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EXAMCAFE
3.3
(18)
Vendido
150
Seguidores
7
Artículos
26080
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes