Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 17 páginas
Examen

NEIEP 800 Final Exam (PDF) | 100 Q&A | Elevator

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

INSTANT PDF DOWNLOAD. NEIEP 800 Final Exam with 100 questions and verified answers. Covers welding tack weld specifications (1 inch, 180 degrees apart), power unit pump drive types (belt or direct coupled), pump pulsation silencer/muffler, and bolster assembly plunger mounting. Pass guaranteed.

Vista previa del contenido

NEIEP 800 Final Exam
Questions and Verified Answers
100% Guarantee Score Pass

Consist of 100 Questions and Answers




1. When welding a joint, lay inch tack welds degrees apart, shift it 90

degrees and lay two more 1 inch tack welds 180 degrees apart.

Ans>> 1, 180



2. On power units having the motor beneath the tank, the pump may be either
driven or coupled.

Ans>> belt, direct

3. The purpose of the / is to silence the effect of any pulsations in the pump

output and should be as close to the pump as possible.

Ans>> silencer, muffler




4. On Bolsters/Bolster Assembly, the plunger is fastened to the
which is then mounted to the center of the Bolster Assembly.
1/5

,Ans>> platen plate




5. With wye-delta, reduced current starting is accomplished without the need for .

Ans>> resistors



6. run buttons should run the platform and sling at leveling speeds only.

Ans>> Temporary




7. A consists of a piston held closed by an adjustable spring and must open at a

certain pressure to prevent any further increase in pressure.-



Ans>> relief valve




8. A lowering valve allows the car to be lowered at a speed not exceed- ing 20fpm in case

of power failure.

Ans>> manual

9. As the oil temperature changes, the will change as well and will effect

the performance, more specifically, the leveling and approach of the elevator.

Ans>> viscosity



10. Be sure wellways are properly to avoid accidental injury to you, your team or

anyone working outside of our industry.

2/5

, Ans>> barricaded




11. Barricades around the wellway must be inches high and be capable of

withstanding a lb force.

Ans>> 42, 200



12. A protects you if you come in contact with a hot wire or component and then come in

contact with ground. It opens the circuit and diverts the supplied current to ground.

Ans>> GFCI




3/5

Información del documento

Subido en
4 de junio de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
10
Seguidores
9
Artículos
635
Última venta
1 año hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes