What are some GENERAL actions PJM might take when
initiating Conservative Ops? (2)


purchase / load additional reserves


raise IROL Transfer limits


cancel all SOS conference calls


begin studying double contingencies - correct answer-purchase
/ load additional reserves & begin studying double
contingencies




(can also LOWER IROL and INCREASE number of SOS calls)

,The purpose of the Heavy Load Voltage Schedule Action is to
increase reactive reserves on: - correct answer-The EHV
System




Under the national Terrorism Advisory System (NTAS) there are
2 types of alerts: - correct answer-Elevated Threat and
Imminent Threat Alert




The following would be considered non-critical plant load:


a. lighting


b. office area a/c


c. induction fans


d. feed water pumps - correct answer-lighting and office area
a/c




What is the purpose of a capacity emergency warning?


a. to inform NERC of expected RTO status for a future failure

,b. to keep Members informed of actual capacity shortages or
contingencies that may jeopardize reliability during RT ops


c. to ask Members to take specific actions in order to provide
relief to the PJM system


d. to keep all affected system personnel aware of the forecast
and/or actual status of the PJM RTO - correct answer-to keep
Members informed of actual capacity shortages or
contingencies that may jeopardize reliability during RT ops AND
to keep all affected system personnel aware of the forecast
and/or actual status of the PJM RTO




Which of the following steps would PJM take as part of initiating
Conservative Ops?


a. Initiate additional off-cost operations to limit or reduce flows
across critical interfaces


b. implement a 5% Voltage Reduction across the entire RTO to
correct high system voltages


c. declare an Energy Emergency Alert Level 5 (EEA5) with
FERC/NERC

, d. Perform job studies looking at the loss of multiple pieces of
equipment as a single event - correct answer-Initiate additional
off-cost operations to limit or reduce flows across critical
interfaces AND Perform job studies looking at the loss of
multiple pieces of equipment as a single event.




Actions in a Low Voltage Alert include:


a. implement 4 hrs prior to Heavy Load Voltage Schedule
Action


b. review transmission and generation outages


c. consider changing Reactive Transfer back-off limit from 300
MW to 50 MW for tighter control


d. request a Reactive Reserve Check - correct answer-review
transmission and generation outages & request a Reactive
Reserve Check




The purpose of the Heavy Load Voltage Schedule Warning is to
have members prepare for maximum support of voltages on the
: - correct answer-Bulk Power System

Información del documento

Subido en
2 de junio de 2026
Número de páginas
58
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Savvynurse
3.6
(58)
Vendido
251
Seguidores
7
Artículos
7851
Última venta
3 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes