Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

CSLB CONTRACTORS LAW PRACTICE TEST PART TWO STUDY GUIDE 2026 CORRECT ANSWERS GRADED A+

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

CSLB CONTRACTORS LAW PRACTICE TEST PART TWO STUDY GUIDE 2026 CORRECT ANSWERS GRADED A+

Vista previa del contenido

CSLB CONTRACTORS LAW PRACTICE TEST
PART TWO STUDY GUIDE 2026 CORRECT
ANSWERS GRADED A+

⩥ 4 years.
Answer: How many years do consumers have to file a complaint with
the CSLB regarding a faulty project?


⩥ 4 years.
Answer: How many years is the contractor liable for patent defects
(obvious or visible defects)?


⩥ 10 years.
Answer: How many years is the contractor liable for Latent (structural)
defects?


⩥ 4 years.
Answer: The CSLB has how long to investigate unlicensed contractors
from the date of the illegal act?


⩥ C) The work must be completed in less than 2 weeks.
Answer: Which of these does not apply for Service & Repair contracts?

,A) Total amount must be for $750 or less
B) The buyer must initiate contact with the contractor
C) The work must be completed in less than 2 weeks
D) No payment is due until the work is completed


⩥ Only before the contractor starts work and before they receive/sign
the contract..
Answer: When can a consumer cancel a Service & Repair contract?


⩥ 10-pt or larger (Anything regarding CSLB must be 12 or larger).
Answer: Unless otherwise specified, how large should font be in
contracts?


⩥ Within 14 days.
Answer: According to the Prompt Payment Act, payments for
construction projects must be received how long after an invoice has
been issued?


⩥ 7 days.
Answer: Subcontractors must be paid within ___ days after a prime
contractor has received payment.


⩥ Lien.

, Answer: A method of securing payments for any unpaid labor or
materials that have been used to improve a property by contractors and
material suppliers.


⩥ Material Breach.
Answer: A major failure by any party, to perform according to the agreed
upon contract terms.


⩥ Immaterial Breach or Partial Breach.
Answer: This violates minor details in a construction contract, and does
not affect the overall agreement or void the contract.


⩥ 90 days.
Answer: How long does a contractor have to report a small claims or
civil court decision to the CSLB?


⩥ Appellate Court.
Answer: If the defendant files an appeal, the lawsuit moves from
superior court to...


⩥ County Clerk's Office.
Answer: Small claims are filed at the...


⩥ Limited civil lawsuit (filed at the local superior court).

Información del documento

Subido en
28 de mayo de 2026
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GradeGalaxy
4.4
(9)
Vendido
129
Seguidores
3
Artículos
43483
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes