COSC 253 EXAM 1 QUESTIONS AND
ANSWERS 2026 VERIFIED.



Who is the Design Team? - ANS Architects, engineers, other consultants


Who is the construction team? - ANS General contractor, trade partners, suppliers


Who is the Owner Team - ANS Owners, financers, user groups


What are the project delivery methods? - ANS Design/Bid/Build
Design/Build
Construction Manager - Fee Based
Construction Manager at Risk (CMAR)


Describe Design/Bid/Build (pros/cons) - ANS - owner hires separate design and construction
teams
- Provides high degree of confidence regarding project schedule and budget
- Separate entities provide checks and balances
- Traditional, well-established method
Cons: difficult to integrate construction expertise into design


Describe Design/Build (pros/cons) - ANS - Owner hires a single design and construction entity
- Fosters coordination between A/E and GC


@COPYRIGHT ALL RIGHTS RESERVED PAGE 1 OF 23

,- Single point of accountability for owner
- Use of this system is growing rapidly
Cons: Fewer checks and balances


Describe Construction Manager (fee based) - ANS - Owner hires independent CM to oversee
design and construction services provided by multiple entities
- Contracts with the owner for a flat fee (could be usually a % of construction or hourly fee)
- Construction expertise is available to owner throughout project
- Commonly associated with large- scale, complex projects


Describe Construction Manager at Risk (CMAR) - ANS - The Construction Manager acts more
like a general contractor and takes greater responsibility (risk) for construction quality, schedule,
and costs
- common for the Construction Manager to contract directly with trade partners (plumber,
electrician, masonry contractor, HVAC contractor, etc.) and agree to deliver the project at a
guaranteed maximum price


What is turnkey construction? - ANS Single entity provides financing as well as design and
construction services


What is Single-Purpose Entity? - ANS Combines owner, design, and construction teams into
one legal entity


What is a fixed fee (lump sum)? - ANS - Owner pays an agreed, fixed amount for work to be
performed
- General Contractor (GC) assumes most financial risk or potential reward


What is cost plus a fee - ANS - Owner pays contractor's direct costs plus an added fee for
overhead and profit
- Contractor is protected from cost uncertainty
- Owner assumes more cost risk/savings reward potential


@COPYRIGHT ALL RIGHTS RESERVED PAGE 2 OF 23

, What are the Other types of risk allocations? - ANS Incentive provisions
Liquidated damages
Bonds


What are liquidated damages in construction contracts? - ANS Financial penalties imposed on
the contractor for not completing the project on time.


What are Incentive Provisions? - ANS financially reward contractor for timely completion of
cost savings (a bonus for finishing early!)


What are Bonds in construction? - ANS (bid, performance, payment) protect against
contractor default


What is Sequential Construction? - ANS - A construction phasing method where each major
phase begins only after the preceding phase is complete
- Design completed before construction starts.


What is Phased (Fast Track) Construction? - ANS A method where design and construction
phases overlap to reduce or compress total project duration/ save time.


Which project delivery method is most commonly associated with sequential construction? -
ANS Design/Bid/Build construction.


Which project delivery methods are best suited for phased construction? - ANS Design/Build
and Construction Management project delivery methods.


What is integrated project delivery? - ANS A trend in project management that improves
collaboration between owners, contractors, and designers.


What is lean construction? - ANS A trend aimed at improving efficiency in production.

@COPYRIGHT ALL RIGHTS RESERVED PAGE 3 OF 23

Información del documento

Subido en
28 de mayo de 2026
Número de páginas
23
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Fyndlay
3.7
(75)
Vendido
421
Seguidores
81
Artículos
20077
Última venta
4 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes